Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-3663, Transmits Powerplex Response Data Comparisons to Support Approval of Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis Dtd Aug 1990.Encl Data Comparisons Withheld (Ref 10CFR2.790)(b)) +
- ML17223B280 +
- ML17223B278 +
- NRC Generic Letter 1991-17 +
- ML17329A226 +
- Press Release-91-132, NRC Staff Plans Meeting with Agreement States on Agency Rulemaking Proceedings +
- ML17306A232 +
- ML18057B328 +
- ML18153C785 +
- NRC Generic Letter 91-17, Generic Safety Issue 29, "Bolting Degradation or Failure in Nuclear Power Plants" +
- ML18346A312 +
- ML18346A126 +
- ML20086K453 +
- ML20085J676 +
- ML20085J673 +
- ML20085J668 +
- ML20085J663 +
- ML20085J051 +
- ML20085H541 +
- ML20085G296 +
- ML20085G150 +
- ML20085G149 +
- 2CAN109104, Forwards Annual Rept of Steam Generator Tube Insps for 1991. No Defective Tubes & Less than 5% of Total Tubes Inspected in Steam Generator a Exhibited Any Degradation +
- ML20085F868 +
- ML20085F862 +
- ML20079K543 +
- ML20091E290 +
- ML20091D873 +
- ML20091D793 +
- ML20091D798 +
- ML20091D790 +
- ML20091D785 +
- ML20091D619 +
- ML20140H556 +
- ML20140H622 +
- ML20262A500 +
- ML20079K723 +
- 3F1091-10, Provides Response to NRC Re Violations Noted Insp Rept 50-302/91-14.Corrective Actions:Short Term Instruction Issued to Operations Personnel Giving Operators Guidance When Breach Found +
- B13946, Provides Addl Info Requested During 910819 Telcon Re Second 10-yr Inservice Insp Testing Program.Info Clarifies Relief Requests Submitted in +
- BECO-91-133, Forwards Response to NOV Re Violations Noted in Insp Rept 50-293/91-17 on 910707-0824.Corrective Actions:Procedure Revised to Ref Drawing of Drywell Head/Top Flange Assembly +
- U-601893, Special Rept:On 911001,ORIX-PRO12 Declared Inoperable in Order to Perform Channel Calibr in Accordance W/Ts Surveillance Requirement 4.3.7.5.Calibr Initially Performed by day-shift C&I Crew,Then Backshift Crew +
- JSP-652-91, Application for Amend to License NPF-62,requesting That S/U(C) Notation Be Retained Under Channel Functional Test Column Heading of TS Table 4.3.1.1-1, Reactor Protection Instrumentation Surveillance Requirements +
- ML20261L899 +
- ML20261L905 +
- ML20151L631 +
- 05000331/LER-1991-010, :on 910917,discovered That Four Foxboro Instrument Nests,Located in Control Room,Did Not Match Seismic Test Configuration.Caused by Missing Bumpers & Guide Rails.Guide Rails & Bumpers Installed +
- U-601885, Affirms That Info in Ltr Re Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E Vital Instrument Buses, & 49, Interlocks & Lcos for Class 1E Tie Breakers, Complete +
- ML20045A309 +
- ML20198P909 +
- L-91-237, Application for Amends to Licenses DPR-67 & NPF-16,revising Fire Protection TSs to Delete Sections 3/4.3.3.7,3/4.7.11, 3/4.7.12 & 6.2.2.e & to Delete Section 6.5.1.6.n,per Generic Ltrs 86-10 & 88-12 +