ML20091D798
| ML20091D798 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/17/1991 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML20091D796 | List: |
| References | |
| NUDOCS 9110290261 | |
| Download: ML20091D798 (3) | |
Text
-,
4 Ref: ICR 91-10 l
I ATLV3 PENT 2 I
R6fRIS AND NARKED 47P PjMES Y
I f.
I l
\\
l I
l l
i I
D.k~$0ffA,0500o334 i 911017 o
ons:-
, RADI0 ACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMIYING CONDITION FOR OPERATION-3.11.2.6 The concentration of hydrogen in the main condenser offgas treatment system shall be. limited to less than or equal to 4% by volume.
APPLICABILITY:
At all times.
-ACTION:
a.
With the concentration of hydrogen in the main cond.:nser offgas treatment system exceeding the limit, restore the concentration to within the limit within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
IN!4:RT 1 With continuoyLmonitors_ inoperable opera ti en t e f-= the emai n ocendeneer.
b.
o Qas.4reet--M syeTF=f-conti f.
4 S 20 %.prov44ed greb-semplec=amseldected et-leesbencegera4cheuromanenenelyzed within,-
rthe=f011owing 4=heurs; "
= - _
._J c.
The provisions.of Specification 3.0.3 are not applicable.
I SURVEILLANCE REQUIREMENTS l
l
- 4.11.2.6 The concentration of hydrogen in the main condenser offgas treatment system shall be determined to be within the above limits by continuously moni-toring the wu te genf. In the main condenser offgas treatment system whenever tha main comtent;cr evacuation system is in operation with the hy.trogen monitors requPrec OPEWABLE by Table 3.3.7.11-1 of Specification 3.3.7.11.
i; L
l-b I
l l
HOPE CREEK 3/4 11-16 Amendment No.
Refewunce:.Im 91-10 DEEHF PGt 'HX2MICAL SPECIFIOLTIQi - 3.11.2.6 DEEttr1 Take the actions required by Specification 3.3.7.11, ACTICH b.
w i
l l
l
-I 4
)
(e l