ML20085H541

From kanterella
Jump to navigation Jump to search
Suppls 910913 Application for Amends to Licenses NPF-11 & NPF-18,modifying Surveillance Requirement 4.4.3.2.1.b,per Generic Ltr 88-01 & Telcons W/Nrc.Amend Covers Monitoring Primary Containment Sump Flow Rate at Least Once Per 12 H
ML20085H541
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/17/1991
From: Piet P
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-01, GL-88-1, NUDOCS 9110280302
Download: ML20085H541 (2)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ .

. '1~

/ C:mmonrealth Edison

) 1400 Opus Pl:co

{ Down:ts Grove, Illinois 60515 October 17, 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Dest Hashington, D.C. 20555

Subject:

LaSalle County Station Units 1 and 2 Supplement to Application for Amendment to facility Operating Licenses NPf-11 and NPF-18 Appendix A. Technical Specifications Generic Letter 88-01

-NRCJochet_Nos,_50.-373.and_30:314,_

Reference:

(a) p. Piet letter to ll.S. NRC dated September 13, 1991.

In the time 1eriod since the Reference (a) transmittal, several teletonferences Tave been held between representatives of Commonwealth Edison (Ceco) and the NRC Staff. These discussions sought to clarify CECO's proposed response to Generic Letter 88-01. In Reference (a), CECO proposed to modify Surveillance Requirement 4.4.3.2.1.b as follows:

"Honttoring the primary containment sump flow rate at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />', and

  • This surveillance is to be performed on average once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> not to exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Technical Specification 4.0.2 does not apply "

To simpitry this requirement, the NRC Staff destres to modify CECO's proposed modification to Surveillance Requirement 4.4.3.2.1,b as follows:

"Honitoring the primary containment sump flow rate on average once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> not to exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,

  • and

..~. _ _ , _ ._ _._ _. _

Technical Specification 4.0,2 does not apply."

~^.9110280302 911017 PDR ADOCK 00000973

.P PDR j ZHLD/1200/1

U.S. Nuclear Regulatory Commtssion - 2- October 17, 1991 The NRC Staff changes are administrative in nature and do not change the intent of CECO's proposed amendment request. Dased upon the nature of the Staff changes, CECO has determined that the proposed changes are acceptable l and do not_ require Ceco On-Site and Off-Site Review. 1 Please direct any questions you may have concerning this submittal to this f ofrice.

Sincerely.

7

,l ), Q . ' l ) f '

Peter L. Piet Nuclear Licensing Administratcr cc: A.B. Davis - Regional Administrator, RIII Senior Resident inspector - LSCS B. L. Siegel - NRR, Project Manager Office of Nuclear facility Safety ZHLD/1280/2 am y w te w-ir--se'y----y-me'- P e-+N- ---'--t'e-" =t v 1-' N '---y1'* - --'-* -**==eyv tmr**N-4D-*p i'F=~ d-*w-fi m '--F*Nw9N :--m--'~" --W-P=--'TWfrw- T '-' I