t l
- C:mmtnw:alth Edis:n
[^
) 1400 Opus Place f.
Downers Grove, HHnois 00515 October 17, 1991 Dr. Thomas E. Morley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Braidwood Station, Units 1 & 2 10 CFR 50.59 Annual Report liRC_DocheLNoW0:nLand_50 %1 i
Dear Dr. Murley:
Pursuant to 10 CFR 50.59(b)(2), Commonwealth Edison is providing the required annual report for Braidwood Station (Facility Operating License Nos.
The annual requirement is based on the Unit I fuel load license (NPF-59) issuance date of October 17, 1986.
This report covers the period from 10/01/90 to 6/18/91 and consists of the descriptions and the safety evaluation summartes for the following:
changes to-the facility described in the Safety Analysts Report; and the execution of one test / experiment not previously described in the Safety t
. Analysis Report.
Included also as part of this report are changes made to features of the Fire Protection Program not previously approved by the commission.
No changes to procedures governed by.10CFR50.59 (a) were performed.
Currently the UFSAR and Fire ~ Protection Report revisions, 9 submitted by December 18 of each year.
This date is based on the anniversary of_the Braidwood Unit 2 Operating License.
These reports cover the period from June 19 of the previous year to June 18 of the year the reports are due.
In order to better coordinate the generation of the above reports and the 50.59 annual report, Commonwealth Edison intends to shift the reporting date
=for annual 50.59 reports to match the UFSAR and Fire Protection Report Revisions.
To accomp1ish this we will submit the next 50.59 report by June 18,'1992.
-That report will cover _the period through December 18, 1991.
In addition, subsequent 50.59 reports shall be submitted annually on the same schedule as the UFSAR and Fire Protection Report revisions.
i r"
/sc1:ID355:1 9110230126 911017 h
k C2 BOO 1 R
ADOCK 05000456 vi I
PDR ppg i
Dr. Thomas E. Hurley 2
October 14, 1991 Please direct any questions regarding this matter to this office.
Very truly yours, f
'/
d&
A. R. Checca Nuclear Licensing Administrator cc:
R. Pulsifer-Braidwood Project Manager, NRR H. Shafer-Chief, Dranch 1-RIII S.G. Dupont-Senior Braidwood Resident Inspector ZNLD/355
!sc1:ID355:2
)
7--
.i.~-
- w
-+-
e-g.-*6-.,p
-,9y.
..-y,
.w,
-.y 7.g
>y
,--,. imp 4gm.g 3,,99.&
t a,