Submits Rept of Results of Steam Generator Tube Plugging Following Seventh Refueling Outage Inservice Insp Completed on 911004.Complete Results of Plugging Will Be Submitted Via Rept on 920331
ML20085G149
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/17/1991
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1988, NUDOCS 9110240147
Download: ML20085G149 (2)


Text

..

o L.

CENTERDOR ENERGY Donald C. Shelton yy) w w n A,

Vce hesdent.Nx66a' INet, Ott 4X62(K01 D3*8 0"5' (419)2492X0 Docket IJutubet $0-346 l i t et:

Nuftibe i NpF-3 serin) !Jumber 1988 October is, 1991 Unitt d Staten Nucicat Reguintoty Commission Document Control Desk Vanhington, D. C.

20$$$

Subject:

Technical Spectilention 4.4.S.5n Report of Steam Generator Tube plugging Gentlemen This let ter is suhait ted in accordance with the requirements of the Davis-Hesse Nuclean power Station (DBtJpS) Uni t Number 1, Opetnting 1.icense, Appendix A. Technical Specifications. Technical Speelfication 4.4.'s.Sa t equir es Toledo Edison t o t epot t to the Nucleat Regulatory Commission (NRC) the number of tubes plugged in cath steam generator f ollowing each inservice inspection of steam generator tubest.

The Seventh kefueling Outage inservice inspection ptocess was completed on October 4, 1991. As n result si the inspection findings, the following steam generator tubes vote plugged:

STEAH GEllERATolt 1-1 STEAM GENERATOR 1-2 14-60 84-66 75-60 84-67 94-129 84-68 98-127 80-64 82-68 H3-6H 68-52 6-51 60 09

~

9110240147 6tgog7

[( [

fDR ADOCK 05000346 PDR l h Ope'o%g Composes C'eveland !!ecthc IHum:nating

' fd0td40n

Docket Huabir 50-346 e!

License Number NPF-3 1

Serial Number 1988 Page 2 Toledo Edison vill provide the complete results of the steam generator

(

tube intervice-inspection in accordance with Technical Specifications 4.4.5.5b and 6.9.1.5b.

This acport vill include: 1. The numser and extent of tubes inspected, 2. The location and percent of vall-thickness penetration for each indication of an imperfection, and

3. The identification of tubes plugged.

This report is submitted on an

-annual basis and is due March 31, 1992.

Should further information be required, please contact j

Mr. Robert V. Schrauder, Hanager - Nuclear Licensing, at (419) 249-2366.

Very truly yours, i

- l,.+[ tAA,- (

s i

FVK/dlm l

cc A. B.-Davis, Regional Administrator, NRC Region 111 I

J. B. Ilopkins, NRC Senior Project Manager V. Levis, DB-1 NRC Senior Resident inspector Utility Radiological Safety Board

-1

_,.. _ _, _...., _. _,