- ENS 45848 +
- ENS 47897 +
- 05000324/LER-2002-001, From Brunswick Steam Electric Plant Unit 2 Regarding Instrumentation Malfunction Results in Loss of Safety Function for High Pressure Coolant Injection System +
- 05000325/LER-2008-004 +
- IR 05000341/2011002 +
- IR 05000272/2010004 +
- ML18041A199 +
- ML090430136 +
- ML18096A774 +
- ML18096A773 +
- ML20029A136 +
- ML19282D029 +
- ML042040317 +
- ML041690156 +
- ML20086G656 +
- ML20097D158 +
- ML20092F425 +
- ML20129D790 +
- ML20151W823 +
- ML20198J535 +
- ML20205P565 +
- ML20236T591 +
- 1CAN098506, Monthly Operating Rept for Aug 1985 +
- 05000254/LER-1994-002-03, :on 940104,B CR HVAC Declared Inoperable. Caused by Failure in Contactor Which Resulted from Cumulative Cycling of Compressor.Contactor Replaced +
- 05000338/LER-1997-008, :on 971027,both EDGs Inoperable During Testing. Caused by TS Surveillance Requirement to Demonstrate Operability of Remaining EDG When One Inoperable.Required TS Actions Cleared Following 1J EDG Testing +
- 05000461/LER-1995-005, :on 950515,RRPs Tripped from Fast to Slow Speed Due to Fault in Reactor Recirculation Control Panel +/- 15 Volt Dc Field Bus Bars.Nest Assembly Which Contained Faulty Field Bus Bars Replaced W/Spare Nest Assembly +
- 05000285/LER-1991-005, :on 910228,steam Generator Pressure Indicator B/PIC-905 Declared Inoperable Due Reading Approx 56 Psig Lower than Normal.Caused by Misinterpretation of Affected Ts.Formal Interpretation Will Be Written +
- 05000293/LER-1990-014, :on 900903,automatic Closing of Primary Containment Sys Group 3 Isolation Valves Occurred While Shut Down.Caused by Transient That Actuated Stated Pressure Switches +
- 05000461/LER-1993-003, :on 931113,reactor Scram,Containment Isolation & Loss of Shutdown Cooling Occurred When Transmitter Simulator Inadvertently Bumped During RPS Lsft.Appropriate Personnel Will Receive Briefing +
- ML20034A929 +
- 05000272/LER-1995-009, :on 950601,valid Test of 1B EDG & Subsequent Inoperability of 1B & 1C EDGs Identified.Caused by Inadequate Vibration Tolerant Design of Original Equipment. Cracked Nipple Replace to Restore EDG 1B Availability +
- 05000272/LER-1989-024, :on 890609,safety Injection Concurrent W/ Reactor Trip Signal Occurred.Caused by Inadequate Drainage of Main Steamlines.Event Reviewed W/Maint Personnel & Procedures Modified +
- 05000397/LER-1990-009, :on 900430,three Separate Spurious Trips of RPS Electrical Protection Assembly (EPA) Circuit Breaker Occurred.Caused by Degraded Component in Logic Board of Epa. RPS-EPA-3F Breaker & Logic Board Replaced +
- 05000397/LER-1998-009, :on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation +
- 05000324/LER-2008-004, Regarding Control Room Emergency Ventilation (Crev) Subsystems Inoperable Due to Failure to Isolate +
- 05000346/LER-2003-009, Regarding Loss of Offsite Power Due to Degraded Regional Grid Voltage +
- ML20042A433 +