Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0698-06, Notifies of Scheduled Completion Date for Unit 3 Re Analysis/Calculation Upgrade Program.Addl Details in Analysis/Calculation Upgrade Program Document,Available on Site + (ML20249B297)
- ML20249B298 + (ML20249B298)
- ML20249B302 + (ML20249B302)
- ML20249B304 + (ML20249B304)
- ML20249B306 + (ML20249B306)
- NSD-NRC-98-5712, Forwards non-proprietary Rev 2 to WCAP-15062 & Proprietary Rev 2 to WCAP-14601, AP600 Accident Analyses - Evaluation Models. Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20249B307)
- IR 05000155/1998003 + (ML20249B308)
- ML20249B310 + (ML20249B310)
- ML20249B311 + (ML20249B311)
- ML20249B312 + (ML20249B312)
- ML20249B313 + (ML20249B313)
- ML20249B314 + (ML20249B314)
- ML20249B316 + (ML20249B316)
- ML20249B317 + (ML20249B317)
- ML20249B318 + (ML20249B318)
- ML20249B320 + (ML20249B320)
- ML20249B321 + (ML20249B321)
- ML20249B322 + (ML20249B322)
- ML20249B323 + (ML20249B323)
- ML20249B324 + (ML20249B324)
- ML20249B325 + (ML20249B325)
- ML20249B326 + (ML20249B326)
- IR 05000298/1998019 + (ML20249B327)
- NG-98-1003, Forwards Annual Repts for Alliant-IES Utils,Inc,Corn Belt Power Cooperative & Central Iowa Power Cooperative IAW Requirements of 10CFR50.71(b) + (ML20249B328)
- ML20249B330 + (ML20249B330)
- ML20249B331 + (ML20249B331)
- ML20249B332 + (ML20249B332)
- ML20249B333 + (ML20249B333)
- ML20249B334 + (ML20249B334)
- ML20249B335 + (ML20249B335)
- 05000277/LER-1997-009-01, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys + (ML20249B336)
- ML20249B338 + (ML20249B338)
- ML20249B339 + (ML20249B339)
- ML20249B340 + (ML20249B340)
- 05000277/LER-1997-009, :on 971109,reactor Scram Occurred.Caused by Generator Lockout Condition & Subsequent Turbine Trip Failure of 2A Reactor Feedpump Turbine to Trip on Demand During Recovery Activities.Reset Appropriate Scram Logics + (ML20249B341)
- ML20249B342 + (ML20249B342)
- 05000368/LER-1998-003-01, :on 980520,determined That Surveillance of Control Element Assembly Position Was Not Being Performed for One Control Element Assembly Group,Per Ts.Caused by Inadequate Verification.Change Implemented + (ML20249B343)
- ML20249B344 + (ML20249B344)
- 05000277/LER-1997-010-01, Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner + (ML20249B345)
- ML20249B347 + (ML20249B347)
- ML20249B349 + (ML20249B349)
- ML20249B350 + (ML20249B350)
- ML20249B351 + (ML20249B351)
- ML20249B352 + (ML20249B352)
- ML20249B354 + (ML20249B354)
- ML20249B355 + (ML20249B355)
- ML20249B356 + (ML20249B356)
- 05000277/LER-1997-010, :on 971229,failure of 2A Reactor Feedpump Turbine to Trip,Occurred.Caused by Main Control Room pushbutton.2A RFPT Trip Device Repaired,Reinstalled & Tested to Prove Operability + (ML20249B357)
- 05000277/LER-1998-003, Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B) + (ML20249B358)
- ML20249B360 + (ML20249B360)
- 05000277/LER-1998-003-01, :on 980513,failure to Meet TS for Main Control Room Emergency Ventilation,Was Identified.Caused by Failure to Follow GP-25 Procedure Guidance.Main Control Room Emergency Ventilation Relays Inspected for Loose Screws + (ML20249B363)