Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248L281 + (ML20248L281)
- ML20248L282 + (ML20248L282)
- ML20248L284 + (ML20248L284)
- ML20248L285 + (ML20248L285)
- ML20248L287 + (ML20248L287)
- ML20248L288 + (ML20248L288)
- ML20248L289 + (ML20248L289)
- IR 05000440/1998007 + (ML20248L290)
- ML20248L292 + (ML20248L292)
- ML20248L294 + (ML20248L294)
- ML20248L296 + (ML20248L296)
- ML20248L297 + (ML20248L297)
- ML20248L298 + (ML20248L298)
- RBG-44408, Forwards Rev 9 to UFSAR for River Bend Station,Unit 1.Rev Contains Changes Made During Period of 960213-0806 + (ML20248L301)
- ML20248L305 + (ML20248L305)
- ML20248L310 + (ML20248L310)
- ML20248L313 + (ML20248L313)
- ML20248L315 + (ML20248L315)
- ML20248L316 + (ML20248L316)
- ML20248L318 + (ML20248L318)
- ML20248L319 + (ML20248L319)
- ML20248L320 + (ML20248L320)
- TXX-9807, Requests That NRC Exercise Enforcement Discretion to Allow CPSES Units 1 & 2 to Remain in Mode 1,Power Operation,W/O Having Performed Portions of TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) During Shutdown + (ML20248L321)
- CY-98-084, Application for Amend to License DPR-61,incorporating Attached Proposed Changes Into TS Re Relocation of Requirements for Seismic Monitor to Be Consistent W/Guidance Contained in GL 95-10 + (ML20248L322)
- ML20248L324 + (ML20248L324)
- ML20248L326 + (ML20248L326)
- ML20248L327 + (ML20248L327)
- ML20248L328 + (ML20248L328)
- ML20248L329 + (ML20248L329)
- NRC-98-0036, Request Change in Implementation Period for 6 Applications for Fermi 2 Operating License Amends Currently Under NRC Review.Applications Requested Timed Period of 60 Days within Which to Implement License Amend Following NRC Approval + (ML20248L330)
- ML20248L331 + (ML20248L331)
- ML20248L332 + (ML20248L332)
- ML20248L333 + (ML20248L333)
- B17116, Monthly Operating Rept for Feb 1998 for Millstone Nuclear Power Station,Unit 3 + (ML20248L334)
- ML20248L335 + (ML20248L335)
- JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP + (ML20248L336)
- ML20248L338 + (ML20248L338)
- ML20248L343 + (ML20248L343)
- ML20248L345 + (ML20248L345)
- 05000382/LER-1998-001, Forwards LER 98-001-00,providing Details of TS 3.0.3 Condition Experienced During Plant Malfunction When LCO Section 3.1.2.4 Was Not Met + (ML20248L348)
- ML20248L351 + (ML20248L351)
- ML20248L352 + (ML20248L352)
- 05000382/LER-1998-001-01, :on 980214,TSs 3.0.3 Condition Occurred Due to Inoperable Charging Pumps.Replaced Failed SX-1 Relay + (ML20248L354)
- ML20248L355 + (ML20248L355)
- ML20248L356 + (ML20248L356)
- ML20248L357 + (ML20248L357)
- NPL-98-0188, Requests Relief from Section XI of ASME Boiler & Pressure Vessel Code, Rules for Inservice Exmanination of Nuclear Power Plant Components, 1986 Edition,No Addenda.Proposed Alternative to Relief Request RR-1-18,encl + (ML20248L360)
- ML20248L362 + (ML20248L362)
- ML20248L363 + (ML20248L363)
- ML20248L364 + (ML20248L364)
- ML20248L367 + (ML20248L367)