ML20248L313

From kanterella
Jump to navigation Jump to search
Provides Conclusion of Case Re Alleged Personel Injury Arising Out Of,Or in Connection W/Use of Radioactive Matl at San Onofre Nuclear Generating Station,Units 1,2 & 3
ML20248L313
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/13/1998
From: Medling E
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9803190303
Download: ML20248L313 (2)


Text

-

~NhTI 5001Hf RN CAlliORMA EDISON

'S""""

~.

Manager. Regulatory Projects An LDISON INTER %A T10%AL~ Cunnuny March 13, 1998 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361, and 50-362 10 CFR 140.6 Follow Up Report, Disposition of Joe and Ellen Kennedy Suit San Onofre Nuclear Generating Station Units 1, 2, and 3

References:

Southern California Edison letter dated December 4,1995 to USNRC,

Subject:

10 CFR 140.6 Report, Joe and Ellen Kennedy Suit The above referenced letter notified the NRC af a claim involving alleged personal injury arising out of, or in connection with, the use of radioactive material at the San Onofre Nuclear Generating Station (SONGS), Units 1, 2, and 3.

Although not required by the 10CFR140, this letter provides the conclusion of that case.

OnMarch6,1998,after22daysoftrialtestimonyand3-1/2hoursof deliberation, a nine-member jury of the United States District Court, Southern District of California, returned a unanimous verdict in favor of both Defendants, Southern California' Edison and Combustion Engineering.

l f

1 l

Dll l

0 9803190303 980313 "

fDR ADOCK 05000206 PDR-

. San Onofre Nuclear Generating Station a Cl nx it, CA 92674 0128 714 368 7492 O]

Fas 714 368-7575 l

l ...

l.

L l'

Documen,t Control Desk If you-require-any additional information, please so advise.

Sincerely,

. S. Medl g l

cc:-

E. W. Merschoff.. Regional Administrator,.NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV L. L. Wheeler, NRC Project Manager, San Onofre Unit 1 M. B. Fields NRC Project Manager, San Onofre Units 2 and 3 l

D. B. Spitzberg, Regional Project Inspector, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 S. S. Bajwa, Section Chief, Decommissioning Section i

n i

l i

a

-_____________ -___-