Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000416/1998005 + (ML20248E755)
- 05000254/LER-1989-001-03, :on 890106,RCIC Pump Discharge Inboard Isolation Valve Failed to Open from Full Closed Position. Caused by Binding of Torque Switch on Valve Operator.Switch Replaced.Reportability Per Part 21 Possible + (ML20248E759)
- ML20248E760 + (ML20248E760)
- ML20248E761 + (ML20248E761)
- ML20248E762 + (ML20248E762)
- ML20248E764 + (ML20248E764)
- ML20248E765 + (ML20248E765)
- 05000352/LER-1989-051, :on 890831,control Room Emergency Fresh Air Supply Sys Inadvertently Secured from Chlorine Isolation Mode of Operation,Causing Sys Inoperability.Caused by Personnel Error.Isolation Manually Initiated + (ML20248E767)
- ML20248E769 + (ML20248E769)
- 05000285/LER-1989-014, :on 890519,auxiliary Feedwater Panel Instrumentation Outside Design Basis Revealed.Caused by Deficiencies in Instrumentation.Fire Watch Established & Stated Abnormal Operating Procedure Modified + (ML20248E770)
- ML20248E773 + (ML20248E773)
- ML20248E774 + (ML20248E774)
- ML20248E775 + (ML20248E775)
- ML20248E777 + (ML20248E777)
- ML20248E778 + (ML20248E778)
- ML20248E780 + (ML20248E780)
- ML20248E781 + (ML20248E781)
- ML20248E783 + (ML20248E783)
- ML20248E784 + (ML20248E784)
- ML20248E785 + (ML20248E785)
- IA-89-407, Final Response to FOIA Request for Records.App a Record Withheld (Ref FOIA Exemptions 4 & 5) + (ML20248E786)
- ML20248E786 + (ML20248E786)
- ML20248E788 + (ML20248E788)
- ML20248E789 + (ML20248E789)
- ML20248E791 + (ML20248E791)
- ML20248E794 + (ML20248E794)
- ML20248E795 + (ML20248E795)
- ML20248E797 + (ML20248E797)
- ML20248E798 + (ML20248E798)
- ML20248E799 + (ML20248E799)
- ML20248E800 + (ML20248E800)
- ML20248E802 + (ML20248E802)
- ML20248E804 + (ML20248E804)
- 05000425/LER-1989-026, :on 890829,high Energy Line Break Valve for Steam Generator Blowdown Isolation Not Tested within ASME Section XI Interval.Caused by Incomplete Communications. Personnel Counseled & Memo Issued Re Testing + (ML20248E805)
- ML20248E807 + (ML20248E807)
- ML20248E813 + (ML20248E813)
- ML20248E815 + (ML20248E815)
- ML20248E816 + (ML20248E816)
- ML20248E817 + (ML20248E817)
- ML20248E823 + (ML20248E823)
- ML20248E825 + (ML20248E825)
- ML20248E826 + (ML20248E826)
- ML20248E828 + (ML20248E828)
- ML20248E830 + (ML20248E830)
- ML20248E833 + (ML20248E833)
- ML20248E834 + (ML20248E834)
- ML20248E838 + (ML20248E838)
- ML20248E839 + (ML20248E839)
- ML20248E840 + (ML20248E840)
- ML20248E843 + (ML20248E843)
- ML20248E844 + (ML20248E844)