Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000282/1989021 + (ML20247N846)
- ML20247N848 + (ML20247N848)
- ML20247N850 + (ML20247N850)
- ML20247N852 + (ML20247N852)
- ML20247N854 + (ML20247N854)
- ML20247N860 + (ML20247N860)
- ML20247N861 + (ML20247N861)
- B13311, Confirms That Top Level Display Features for post-LOCA Variables & Containment Hydrogen Concentration as Described in Util Implemented During Second Refueling Outage & Operational as of 890707 + (ML20247N862)
- ML20247N863 + (ML20247N863)
- ML20247N867 + (ML20247N867)
- 05000304/LER-1989-008-07, :on 890624,breaker 27 Opened Causing Power Loss to NSSS Annunciators in Control Room.Caused by Binding of Breaker Mechanism Resulting in Insufficient Contact Pressure.Breaker 27 Removed & Replaced + (ML20247N868)
- ML20247N871 + (ML20247N871)
- ML20247N873 + (ML20247N873)
- ML20247N875 + (ML20247N875)
- RBG-31519, Special Rept:On 890620 & 26,temp in Diesel Generator 1B Control Room Greater than Tech Spec Limit of 104 F for More than 8 H.Caused by Heat Generated Inside Standby Diesel Generator Bldg.Temps Continue to Exceed Tech Spec Limits + (ML20247N876)
- ML20247N879 + (ML20247N879)
- ML20247N881 + (ML20247N881)
- ML20247N882 + (ML20247N882)
- ML20247N884 + (ML20247N884)
- ML20247N885 + (ML20247N885)
- AECM-89-0150, Informs That Util Does Not Prohibit,Restrict or Discourage Employees or Contractor/Subcontractor Employees,From Contacting NRC Re Potential Safety Issues,In Response to NRC + (ML20247N886)
- ML20247N889 + (ML20247N889)
- IR 05000277/1989012 + (ML20247N893)
- ML20247N894 + (ML20247N894)
- 05000251/LER-1989-002, :on 890412,Train a Safeguards Actuation Occurred After Operator Installed Fuses.Caused by Inadequate Administrative Controls.Instruction to Use Procedure Added to Std Clearances + (ML20247N895)
- ML20247N896 + (ML20247N896)
- 05000317/LER-1989-011, :on 890630,missing Fire Damper Discovered in Spent Fuel Pool Ventilation Sys.Caused by Error in Facilities Change Request That Installed Fire Dampers.Action Statement Entered & 1 H Rept Made + (ML20247N899)
- ML20247N902 + (ML20247N902)
- ML20247N903 + (ML20247N903)
- ML20247N911 + (ML20247N911)
- IA-89-108, Discusses Evaluation of Loss of DHR Events for Escalated Enforcement + (ML20247N919)
- ML20247N919 + (ML20247N919)
- ML20247N921 + (ML20247N921)
- ML20247N927 + (ML20247N927)
- ML20247N929 + (ML20247N929)
- ML20247N936 + (ML20247N936)
- 0CAN078921, Discusses Special Insp Re Past Util Efforts to Establish Compliance W/Ie Bulletins 79-02 & 79-14.Util Intends to Examine Issues Which Led to Discrepancies in Anchor Bolt Sampling Sizes Per IE Bulletin 79-02 + (ML20247N938)
- ML20247N941 + (ML20247N941)
- ML20247N943 + (ML20247N943)
- ML20247N947 + (ML20247N947)
- BSEP-98-0109, Provides Response to Violations Noted in Insp Repts 50-324/98-04 & 50-325/98-04.Corrective Actions:Communication of Issue to Other Engineering Personnel Currently Scheduled for Completion by 980625 + (ML20247N948)
- ML20247N951 + (ML20247N951)
- SVP-98-189, Informs NRC That Testing of Nine Addl Contacts Has Been Completed,Per GL 96-01 + (ML20247N956)
- ML20247N957 + (ML20247N957)
- ML20247N958 + (ML20247N958)
- ML20247N959 + (ML20247N959)
- IR 05000298/1989029 + (ML20247N962)
- ML20247N963 + (ML20247N963)
- ML20247N966 + (ML20247N966)
- ML20247N969 + (ML20247N969)
- AECM-89-104, Special Rept 88-007/1:on 881214,field Amps,Line Amps & Generator MVARs Began Oscillating During Diesel Generator 11 Surveillance.Caused by Number 1 Rectifier Bridge Circuit. Diesel Generator Restarted,Loaded & Surveillance Completed + (ML20247N972)