ML20247N861

From kanterella
Jump to navigation Jump to search
Corrected Amends 111 & 101 to Licenses DPR-77 & DPR-79, Respectively Re Limiting Conditions for Operation for Relief Valves Operating & Reactor Trip Sys Instrumentation
ML20247N861
Person / Time
Site: Sequoyah  
Issue date: 05/26/1989
From:
NRC
To:
Shared Package
ML20247N870 List:
References
NUDOCS 8906060046
Download: ML20247N861 (7)


Text

_ _ _ _ _ _

CORRECTED PAGES FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Revise the Appendix A Technical Specifications by removing the pages idertified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3/4 4-4a 3/4 4-4a.

3/4 4-4b 3/4 4-4b 3/4 11-14 3/4 11-14 P

I.

u REACTOR COOLANT SYSTEM RELIEF VALVESM OPERATING LIMITING CONDITION FOR OPERATION 3.4.3.2 Two power relief valves (PORVs) and their associated block valves shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

a.

With one or more PORV(s) inoperable, but capable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status or close the associated block valve (s); otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one PORV inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV to OPERABLE status or close the associated block valve and remove power from the block valve; restore the PORV to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i c.

With both PORVs inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore each of the PORVs to OPERABLE status or close their associated block valves and remove power from the block valves and be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With one or more block valve (s) inoperable, within I hour:

(1) restore the block valve (s) to OPERABLE status, or close the block valve (s) and remove power from the block valve (s), or close the PORV(s) and remove power from its associated solenoid valve (s); and (2) apply the ACTION b. or c. above, as appropriate. for the isolated PORV(s).

e.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.4.3.2.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

l l

a.

Performance of a CHANNEL CALIBRATION, and 1

b.

by operating the valve through one complete cycle of full travel.

4.4.3.2.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.

SEQUOYAH - UNIT 1 3/4 4-4a Amendment No. 12, 105, 111 a

REACTOR COOLANT SYSTEM l

SURVEILLANCE MOUIREMENTS (Continued) 4.4.3.2.3 (Deleted.)

4.4.3.2.4 In addition to the requirements of Specification 4.0.5 the repair welds and adjoining areas of the pressurizer relief line shall be examined, using improved UT detection and evaluation procedures which have been demon-strated to be effective in detecting IGSCC, prior to entering MODE 4 whenever the plant has been in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more if the examination has not been performed in the previous 6 months.

In the event these 6-month period examinations find the piping free of unaccept-i able indications for 3 successive inspections, the inspection interval shall be extended to 36 month intervals (1 12 months to coincide with a scheduled refueling outage).

In the event these 36-month period examinations find the piping free of unacceptable indication; for 3 successive inspections, the inspection interval shall be extended to 80-month periods.

n I

j i

l l

l 1

SEQUOYAH - UNIT 1 3/4 4-4b Amendment No. 12, 105

-s-n.,-

TABLE 4.11-2 (Continued) 3:

I TABLE NOTATION w

j Venting - Applicable in MODES 1, 2, 3, and 4;.the containmentewill be vented to the containment annulus and then to the auxiliary building via containment annulus fans.

The lower containment compartment shall.

be sampled oaily when venting is to occur to account for the radio-activity being discharged from the venting process, 1

e u

I f

i SEQUOYAH - UNIT 1 3/4 11-14 Amendment No. 42 I

CORRECTED PAGES FACILITY OPERATING LICENSE NO. DPR-79

~

DOCKET NO. 50-328 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of l

4 change.

l REMOVE INSERT 3/4 3-4 3/4 3-4,

3/4 4-8 3/4 4-8 3/4 4-8a 8

~ - - - _ _ - - -. _ - _ - _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _

51 NO I

2 26 26 a

b c

d b

e T

1 11 11 8

8 8

8 8

8 C

A 5

5 d

d n

n E

a a

L d

BS n

AE 2

24, 24, a

2 CD IO LM 1

13 13 2

1 1

1 1

1 P

PA SE MLL UEB MNA I NR NAE 2

22 22 2

3 3

3 2

3 N

I HP O

MCO I

TA T

)

N d

E S

e M

LP u

U EI n

R NR i

T NT 1

11 11 1

2 2

2 1

2 t

S A

n N

HO o

I CT C

(

M E

1 T

S 3

Y S

S 3

.L P

OE E

I NN L

R N

B T

LA 2

22 22 2

4 4

4 2

4 A

AH T

R TC O

O T

TF CA

- O E

R n

n o

o i

i s

t t

k a

a c

r r

r o

e e

e l

b p

p r

m O

O e

n n

n a

n t e o

o o

h o

t r

r n g6 r

r r

C r

u se e

I n-t t

t t

p rw cw aP u

u u

e u

n eo i o mR e

e e

s3 e

I kP gP e

N N

N l 1 N

a o

t ex u-n ed Ld st u e

e e

pP e

i o

rn n

yal g

g g0 m

g i

Ba pa SiF n7 n8 n1 I

n9 T

t n

i n

d a-a-

a-e a-c ppw rpw pen RP RP RP er dP e

iuo T uo imo nu T

j rtd td rrr r,

r r

is r

I n

Trt crt iet ex ex ex bs ex N

IF au iau t u wu wu wu re wu U

S rth tth rne ol ol ol ur ol yE oSS oIN PF PF PF TP PF R

ASS L

t t

n t

A em c

o c

N f o a

t a

O ar e

u e

I Sf RAB AAB RA B

C D

E F

G TCN U

9 0

1 2

F 1

2 2

2

,EgEl3z c{ "

wD wA

>5E5E g*+[.=*g.

_n%jr o" 53@ O" "4=g 7I l

J

(

i' REACTOR COOLANT SYSTEM RELIEF VALVES - OPERATING 71 LIMITING CONDITION FOR OPERATION 3.4.3.2 All power operated relief valves (PORVs) and their associated block valves shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

a.

With one or more PORV(s) inoperable, but capable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status or close the associated block valve (s); otherwise, be in at least HOT STANDBY within the next 6 hcurs and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one PORV inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV to OPERABLE status or close the associated block valve and remove power from the block valve; restore the PORV to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With both PORVs inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore each of the PORVs to OPERABLE status or close their associated block valves and remove power from the block valves and be in H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With one or more block valve (s) inoperable, within 1 hour:

(1) restore the block valve (s) to OPERABLE status, or close the block valve (s) and remove power from the block valve (s), or close the PORV(s) and remove power from its associated solenoid valve (s);

and (2) apply the ACTION b. or c. above, as appropriate, for the isolated PORV(s).

e.

The provisions of Specification 3.0.4 are not applicable.

SjjRVEILLANCEREQUIREMENTS 4.4.3.2.1 In addition to the requirements of Specification 4.0.5, each MRV shall be demonstrated OPERABLE at least once per 18 months by:

a.

Performance of a CHANNEL CALIBRATION, and b.

Operating the valve through one complete cycle of full travel.

4.4.3.2.2 Each block valve shall be demonstrated OPERABLE at least once pec 92 days by operating the valve through one complete cycle of full travel.

SEQUOYAH - UNIT 2 3/4 4-8 Amendment No. 94, 101

_ _ _ _ _ _ _ _