Enforcement Conference Summary Rept 99990001/98-09 on 980507.Major Topics Discussed:Events Surrounding Occurrence of Violation,Corrective Actions Taken & Enforcement Options Available to Commission
ML20247N969
Person / Time
Issue date: 05/14/1998
From: Joustra J, Minnick S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20247N953 List:
References
REF-QA-99990001-980514 99990001-98-09, 99990001-98-9, NUDOCS 9805270282
Download: ML20247N969 (3)


Text

_

k U.S. NUCLEAR REGULATORY COMMISSION REGION I l

ENFORCEMENT CONFERENCE

SUMMARY

Report No.

999-90001/98-009 Docket No.

999-90001 License No.

None Licensee:

Breitling USA, Inc.

2 Stamford Landing Stamford, CT 06902 Facility Name:

Breitling's USA Conference Date and Time: May 7,1998 at 10:00 a.m.

Conference Location:

NRC Region I, King of Prussia, Pennsylvania inspectors:

h Sheri Minnick date Health Physicist Approved By:

.t d n

[//'f/ 41'

@ith A. Joustra,f::fety E;anch ting Chief

/ da(e Nuclear Materials sa Pre-decisional Enforcement Conference Summary: An open pre-decisional enforcement conference was conducted on May 7,1998, to discuss the apparent violation identified as a result of NRC Inspection No. 999-90001/98-002. Enforcement options available to the Commission were discussed. The licensee described the events surrounding the occurrence of the violation and the corrective actions taken.

RETilRil ORIGIt2L Tn REGIC:!I

^

9805270282 980514 REG 1 GA999 ENV*****

99990001 PDR 3

CONFERENCE

SUMMARY

Breitling USA, Inc.

NRC Enforcement Conference Report No. 999-90001/98-009.

[.

~ On May 7,1998, Region I conducted a predecisional enforcement conference with Breitling, USA, Inc. Mr. Pangburn opened the conference by stating that the purpose of the meeting was I

to provide the licensee an opportunity to discuss the events surrounding the apparent violation.-

and provide any additional information that the NRC should consider in its enforcement deliberations including corrective actions that Breitling has taken. ' Ms.' Joustra explained that the NRC would like to understand the chain of events surrounding Breitling's discovery of the need for an NRC license.' Ms. Minnick discussed the apparent violation involving the possession, use, and transfer of byproduct material without an NRC license.

Mr. Brown confirmed that a violation had occurred, namely Brietling's possession, use and distribution of tritiated watches without an NRC license. Mr. Brown summarized the events as he understood them regarding how the company became aware of the need for an NRC license to possess and distribute tritium watches. He stated that Breitling was rot familiar with NRC requirements for a license. The company began a process of gathering information from other watch companies and radiological consultants in November 1997 due to an inquiry from their parent company in Switzerland regarding regulations in other countries. The NRC called Breitling on February 26,1998 and determined that Breitling had been distributing watches containing tritium without the required licensing. In response to a Confirmatory Action Letter (CAL), the company ceased distribution and repair of watches until they obtained an NRC license. They also filed for an NRC possession license and a distribution license, and hired a radiological consultant to perform wipe tests and decontaminate,their facility.' Mr. Brown summarized their corrective actions, which included hiring a radiological consultant to set up a

. radiation protection program at their site, perform bioassays of workers, perform weekly visits, and provide training to workers.

. Mr. Holody then explained the enforcement options available to the Commission.

The meeting was adjourned.

2 Enforcement Conference Report No. 999-90001/98-009 G:\\DNMSDoCWoRKCoNFRPT\\RNoNE.

_-__l____._----__.--L-

.o.

'3 LIST OF PERSONS ATTENDING

- Licensee Keith Brown, Vice President

.NRC Sheri A. Minnick, Health Physicist Judith A. Joustra, Acting Branch Chief, Nuclear Materials Safety Branch 3 -

George Pangburn, Deputy Division Director, Division of Nuclear Materials Safety.

J. Bradley Fewell, Regional Counsel Daniel J. Holody, Enforcement Officer I

)

i

)

3' Enforcement Conference Report No. 999-90001/98-009 G:ONMSOOCWORKOONFRPTHNONE.

.j w___

-_ _ - _ _ - _ _ - _. _ _ _ - _ _ _ - _ _ - _