Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000414/LER-1989-016, :on 890616,both Channels of Upper Range Reactor Vessel Level Instrumentation Found Inoperable.Caused by Supervision Assigning Unqualified Technician to Return Instrumentation to Svc on 890528 + (ML20247K061)
- ML20247K062 + (ML20247K062)
- ML20247K065 + (ML20247K065)
- ML20247K067 + (ML20247K067)
- 05000409/LER-1989-001, :on 890424,discovered That Weekly Battery Tests for Previous Wk Had Not Been Performed.Caused by Absences of Key Personnel Who Supervise & Perform Tests.Required Testing Procedures Performed + (ML20247K071)
- ML20247K072 + (ML20247K072)
- IR 05000482/1989023 + (ML20247K073)
- ML20247K075 + (ML20247K075)
- ML20247K077 + (ML20247K077)
- ML20247K080 + (ML20247K080)
- ML20247K082 + (ML20247K082)
- ML20247K084 + (ML20247K084)
- ML20247K086 + (ML20247K086)
- ML20247K090 + (ML20247K090)
- PNO-II-89-064, on 890907,plant Shut Down for More than 48 H to Determine Cause of Out of Spec Secondary Chemistry.Msiv a Test Circuitry Discovered Energized & Valve Declared Inoperable on 890908.Caused by Water Hammer in Flush Line + (ML20247K092)
- PNO-II-89-063A, on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure + (ML20247K095)
- ML20247K096 + (ML20247K096)
- ML20247K097 + (ML20247K097)
- ML20247K098 + (ML20247K098)
- ML20247K101 + (ML20247K101)
- 0CAN078919, Requests Withdrawal of Proposed Tech Specs Re Visual Insp Periods for Inaccessible Snubbers Submitted in s. Unplanned Outages & Scheduled Midcycle Outage for Unit 1 Eliminated Need for Changes + (ML20247K107)
- ML20247K108 + (ML20247K108)
- IR 05000313/1989027 + (ML20247K109)
- ML20247K110 + (ML20247K110)
- 05000324/LER-1989-006-03, :on 890424,HPCI High Steam Flow Isolation Instrument E41-PDT-N005 Failed in Upscale Tripped Position Causing HPCI Steam Supply Inboard Isolation Valve to Isolate.Caused by Failed Sensor Module + (ML20247K111)
- ML20247K113 + (ML20247K113)
- ML20247K115 + (ML20247K115)
- ML20247K116 + (ML20247K116)
- ML20247K117 + (ML20247K117)
- ML20247K119 + (ML20247K119)
- 05000344/LER-1989-008, :on 890421,door Which Opens to Outside at End of Corridor Between Control Bldg & Security Doors to Auxiliary Bldg Opened During Fuel Movement.Caused by Lack of Administrative Controls.Night Order Issued + (ML20247K122)
- 05000416/LER-1989-012, :on 890814,main Condenser Expansion Joint Failed Causing Condenser Vacuum to Decrease & Reactor Scram. Caused by Rupture of Section of Condenser Expansion Belt. RCIC Sys Manually Initiated + (ML20247K123)
- ML20247K125 + (ML20247K125)
- IR 05000271/1989004 + (ML20247K126)
- ML20247K127 + (ML20247K127)
- ML20247K128 + (ML20247K128)
- ML20247K129 + (ML20247K129)
- ML20247K130 + (ML20247K130)
- ML20247K133 + (ML20247K133)
- 05000368/LER-1984-015, :on 840302,discrepancy in Fire Barrier Penetration 2099-0002,which Previously Evaluated Acceptable, Identified as Nonfunctional.Caused by Lack of Definitive Guidelines in Walkdown Program + (ML20247K135)
- 05000483/LER-1989-002, :on 890228 & 0303,unplanned ESF Actuations Occurred.Caused by Shield Breakage of Coaxial Cable & Technician Inadvertent Push of ESF Actuation Push Button, Respectively.Cable Replaced + (ML20247K137)
- ML20247K138 + (ML20247K138)
- ML20247K139 + (ML20247K139)
- IR 05000369/1989029 + (ML20247K141)
- ML20247K143 + (ML20247K143)
- ML20247K144 + (ML20247K144)
- 05000259/LER-1998-001, Forwards LER 98-001-00 Re Failure to Meet Requirements of ANSI Stds N510-1975, Testing of Nuclear Air Cleaning Sys, During Performance of Standby Gas Treatment Sys Surveillance Testing + (ML20247K145)
- 0CAN059805, Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 2 + (ML20247K150)
- ML20247K151 + (ML20247K151)
- 05000482/LER-1989-011, :on 890623,both Class 1E Air Conditioning Units SGK05A & SGK05B Were Inoperable.Caused by Loose Wire Disconnected from Lug on pump-down Switch.Wire Recrimped & Units Returned to Svc.Personnel Reinstructed + (ML20247K152)
- SNRC-1596, Requests Exemption from 10CFR50.54(w) Re Onsite Property Damage Insurance Requirements + (ML20247K153)