Text
w ___ _ - - -
-__
_
--
-
._
_
-
-.
__
_ _ _ .
L, -
-
,
.
L
g ; 2 gg
DOCUMENT CONTAINS .
)
'
'In' keply Refer To:
SAFEGUARDS INFORMATION
i
J Dockets:
50-313/89-27
50-368/89-27
Arkansas Power, & Light Company
ATTN:
Mr. Gene Campbell-
Vice President, Nuclear
Operations
P.O. Box 551
.
i
'
~ Little Rock, Arkansas 72203
Gentlemen:
1
'
This refers to the inspection conducted by Messrs. J. A. Kelly and
R. A. Caldwell of this office during the period June 5-9, 1989, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. N. S. Carns and
other members of your staff at the conclusion of the inspection.
Areas within the security program were examined during this inspection. Within
these' areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspectors. The inspection findings are documented in the enclosed
inspection report.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR.Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
Within the scope of the inspection, no violations or deviations were
identified. However, we are concerned about the training provided for the
security staff to ensure that firearm proficiency is maintained at a proper
level.
Our concerns are discussed in paragraph 3 of the enclosed inspection
report.
Accordingly, you are requested to evaluate our concern $and respond, in
writing,'within 30 days of receipt of this letter advising us of the results of
-your evaluation.
C:RPB
C:b
- PS
D:DRP
.
RJ
tt
'BMurray
B e ch bJLMilhoan
y/tw
11
/g /89
g ) 7/89
7/g/89
l /89
' 7 /et /89 ) 7 M2489
8907310443 890712
ADOCK 05000313
Q
ENCLOSURE CONTAINS
DOCUMENT CONIMNS
SAFEGUARDS INFORMATION
1 t
SAFEGUARDS INFORMAT10W
UPON SEPARATION THIS
__-- _ -- -__
i
. _ - _ _ _ _ __
. _ _ _
b
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
DD)
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/89-27
50-368/89-27
cc w/ summary page only:
Arkansas Nuclear One
ATTN:
N. S. Carns, Director
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec copy of entire report:
RIV Security File
P. A. Starcher, RSGB/NRR
R. D. Martin, RA
B. Beach, DRSS
Chief, RPB
Section Chief, SEPS:RPB
Security Inspector
Resident Inspector
SEPS:RPB File
G. F. Sanborn, EO
D. M. Crutchfield, NRR
bcc copy of letter and inspection summary only w/766:
Lisa Shea, RM/ALF
Section Chief, DRP/A
RIV File
MIS
RSTS Operator
R. E. Hall, DRSS
Project Engineer, DRP/A
bec copy of letter and inspection summary only w/out 766:
DMB IE-04
,