Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Y657 + (ML20235Y657)
- ML20235Y659 + (ML20235Y659)
- 05000423/LER-1987-034-01, :on 870923,during Full Power in Mode 1,reactor Trip Occurred Due to Lo Lo Steam Generator Level.Caused by Failure of Solenoid Valve Which Controls Hydraulic Oil Flow to Isolation Valve.Solenoid Replaced + (ML20235Y662)
- 05000295/LER-1987-013-05, :on 870621,outer Door on Containment Personnel Hatch Malfunctioned.Caused by Out of Adjustment Cam & Follower Mechanism.Hatch Outer Door Repaired by Mechanical Maint on 870621 + (ML20235Y663)
- 05000277/LER-1989-002-01, :on 890202,determined That Several Conditions Found During Analysis of Unsuccessful Special Test of Emergency Cooling Sys May Inhibit Function of Sys Needed to Maintain Safe Shutdown + (ML20235Y664)
- ML20235Y665 + (ML20235Y665)
- ML20235Y667 + (ML20235Y667)
- ML20235Y668 + (ML20235Y668)
- IR 05000295/1989006 + (ML20235Y676)
- ML20235Y680 + (ML20235Y680)
- 05000302/LER-1989-005, :on 881110,small Cracks in Masonry Fire Barrier Identified.On 890202,event Determined to Be Design Basis Issue.Caused by Failure of Const Personnel to Build Ref Fire Barriers in Accordance W/All Design Specs + (ML20235Y682)
- TXX-6812, Interim Deficiency Rept CP-86-45 Re Interaction of Seismic Category II Sys & Components W/Seismic Category I Installations.Initially Reported on 860606.Engineering Validation Being Performed.Next Rept Expected by 880108 + (ML20235Y687)
- IR 05000313/1988029 + (ML20235Y689)
- 05000482/LER-1987-039, :on 870916,absence of Position Indication for Pressurizer PORV BB-PCV-456A Block Valve Bb HV-8000B Discovered.Probably Caused by Personnel Error.Discussions Held W/Involved Personnel & Supervisors + (ML20235Y690)
- IA-84-776, Summarizes Aslab 840906 Decision Affirming Board 820831 Initial Decision Authorizing Full Power License for Unit 1. Board 840910 Order Requests Parties Views for Further Action on Unit 2 & 840906 Order Denies Reopening Seismic Issues + (ML20235Y692)
- ML20235Y692 + (ML20235Y692)
- ML20235Y695 + (ML20235Y695)
- ML20235Y698 + (ML20235Y698)
- ML20235Y702 + (ML20235Y702)
- PNO-III-89-016A, on 890306,Unit 1 Returned to Operation Following Reactor Scram on 890302.Unit 2 Remained in Operation & Unit 2 Station Auxiliary Transformer,Which Failed on 890302,repaired & Returned to Svc + (ML20235Y706)
- NRC-89-0025, Responds to NRC Re Violations Noted in Insp Rept 50-341/88-37.Corrective Actions:Improperly Annotated Drawings Corrected & Reading Issued to QA Audit Describing Need to Verify Intent That Tech Specs Requirements Met + (ML20235Y708)
- ML20235Y709 + (ML20235Y709)
- ML20235Y715 + (ML20235Y715)
- ML20235Y716 + (ML20235Y716)
- ML20235Y721 + (ML20235Y721)
- ML20235Y724 + (ML20235Y724)
- ML20235Y726 + (ML20235Y726)
- ML20235Y727 + (ML20235Y727)
- ML20235Y728 + (ML20235Y728)
- ML20235Y734 + (ML20235Y734)
- ML20235Y735 + (ML20235Y735)
- ML20235Y737 + (ML20235Y737)
- ML20235Y742 + (ML20235Y742)
- ML20235Y746 + (ML20235Y746)
- ML20235Y748 + (ML20235Y748)
- ML20235Y751 + (ML20235Y751)
- ML20235Y753 + (ML20235Y753)
- ML20235Y756 + (ML20235Y756)
- ML20235Y758 + (ML20235Y758)
- ML20235Y759 + (ML20235Y759)
- 05000352/LER-1987-047, :on 870914,isolation of Main Control Room HVAC Occurred.Caused by Elevated Chlorine Levels in Control Encl HVAC Intake Plenum.Electronic Indications Checked & Verified to Be Operating Properly + (ML20235Y761)
- ML20235Y762 + (ML20235Y762)
- ML20235Y767 + (ML20235Y767)
- ML20235Y769 + (ML20235Y769)
- U-601059, Monthly Operating Rept for Sept 1987 + (ML20235Y770)
- ML20235Y771 + (ML20235Y771)
- ML20235Y773 + (ML20235Y773)
- IR 05000498/1989005 + (ML20235Y775)
- ML20235Y777 + (ML20235Y777)
- ML20235Y781 + (ML20235Y781)
- ML20235Y782 + (ML20235Y782)