=yy
-.
.
-
-
- - -
- - - - - --- - - - - -
-
- - -
- - - - -
-
--
.
,
s;
, , ,
~
g1
4
- 5....
., .
,
4 yo,
L
1AR.
3-1989-
!
~
,,
,
=
,
,
,
.j
In Reply, Refer *To..
-
'
,
.
Docket: 1.50-285/89-05
<
~"
s
-
,
tomaba Public Power DistricE . .
ATTN:" Kenneth; J.LMo'rris, Division' Manager
.I
.
I
' Nucleari 0perations.
>
,1623 Harney. Street <
Omaha,LNebraska' 68102l
,
Gentlemen::
')
"
Thisrefer$totheins'pectionconductsdbyMessrs.M..E. Murphy,D.R. Hunter.
and C. E. Johnson-of this office during the. period January 30 through
February 3.1989,- of activities authorized by NRC Operating License DPR-40 for ~
!
,
'the' Fort Calhoun Station a~nd to the' discussion.of our findings with'
'
'Mr.~ W. G.' Gates and 'other members of your staff at.the. conclusion of the
. inspection.;
.
- Areas examined during the inspection included followup on previouslyLidentified
"
items, theiimplementation of the' anticipated' transient without scram (ATWS)
-requirements, and licensee event reports. Within these' areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with' personnel, and observations by the NRC inspectors. The
Linspection: findings are documented in the enclosed inspection report.
The . status of the previously . identified inspection finding items is' identified
in paragraphi2.0 of the enclosed. report.
During this inspection, it was <found that certain of your activities were in
violation of NRC requirements. : Consequently, you are required to respond to
this violation, in writing, in accordance with the' provisions of Section 2.201
of the NRC's " Rules.of Practice,"~ Part 2 Title 10, Code of Federal
' Regulations. : Your response'should be based on the specifics contained in the
Notice of Violation enclosed with this letter.- In addition, this response:
should. address your verification that similar dimensional errors do not exist
in other. pipe support calculations.
'The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL-96-511.
q
RIV:TPS*
OPS *-
PSS*
C:PSS*
C:TPS*
D:DRS*
D:DRP *
MEMurphy;ap
DRHunter CEJohnson
TFStetka
WCSeidle
JLMilhoan LJCallan
/ /89
/ /89
/ /89
/ /89
/ /89
/ /89
/ /89
!
- previously concurred
SYB /gk
[f[pg O
t
!
,
es
~
1
L
_ _ _ _ - _
..-
3. -
.
..
,
Omaha Public Power District
2-
j
i
'Should you have any questions concerning this inspection, we will be. pleased to
i
- discuss them with you.-
Sincerely,
!
Original Signed By
L. L Callan
L.-J. Callan, Director
1
Division of Reactor Projects
"
Enclosures:
.
l
,
1.
Appendix A - Notice of Violation
2.
Appendix B --NRC Inspection Report
50-285/89-05
j
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
j
.P.O. Box 399
,
Fort Calhoun,-Nebraska -68023
Harry H. Voigt. Esq.
.
LeBoeuf, Lamb, .Leiby & MacRae
1333 New Hampshire Avenue, NW
l
Washington,-D. C.
20036
'
Nebraska Radiation Control Program. Director
bectoDMB(IE01)-
-bec distrib. by RIV-
<
- R.D. Martin, RA
- RPB-DRSS
,
- Section Chief (DRP/B)
- MIS System
i
- RIV File
- DRP
!
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
- DRS(2 cog)ies)
- P. Milano, NRR Project Manager (MS:
13-D-1
- RRI
- M. Murphy
- D. R. Hunter
- C. Johnson
- W. C. Seidle
- T. F. Stetka
- w/766
,