Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-21450, Forwards Supplemental Commitment Dates Re Significant Deficiencies Identified in Insp Rept 50-458/84-35,per Util & 850614,19 & 28 Telcons.List Contains Revised Projected Completion Dates for Fuel Load + (ML20235X090)
- IR 05000266/1987016 + (ML20235X091)
- ML20235X092 + (ML20235X092)
- ML20235X096 + (ML20235X096)
- ML20235X098 + (ML20235X098)
- ML20235X099 + (ML20235X099)
- ML20235X100 + (ML20235X100)
- ML20235X102 + (ML20235X102)
- ML20235X103 + (ML20235X103)
- 05000334/LER-1987-016-01, :on 870914,Tech Spec 4.0.2 Limits Found Exceeded Due to Personnel Not Analyzing Samples of Fuel Oil During 861015-1126 Due to Out of Svc Centrifuge.Caused by Cognizant Chemistry Personnel Error + (ML20235X105)
- ML20235X108 + (ML20235X108)
- ML20235X117 + (ML20235X117)
- W3P85-3803, Responds to Violations Noted in Insp Rept 50-382/85-25 Re Annual Emergency Exercise.Corrective Actions:Shift & Control Room Supervisors Reminded to Notify NRC of Any Declared Emergency No Later than 1 H After Declaration + (ML20235X119)
- ML20235X120 + (ML20235X120)
- PY-CEI-NRR-0686, Forwards LERs 87-042-00 & 87-043-00 + (ML20235X126)
- ML20235X127 + (ML20235X127)
- ML20235X128 + (ML20235X128)
- ML20235X130 + (ML20235X130)
- ML20235X134 + (ML20235X134)
- ML20235X136 + (ML20235X136)
- ML20235X138 + (ML20235X138)
- B12592, Responds to & Comments on Findings of SALP Board W/Emphasis on Board Recommendations for Individual Evaluation Categories.Response to Each of Board Recommendations for Plant Encl.Util Goal to Return to Category 1 in All Areas + (ML20235X142)
- ML20235X144 + (ML20235X144)
- ML20235X147 + (ML20235X147)
- ML20235X149 + (ML20235X149)
- ML20235X151 + (ML20235X151)
- 05000333/LER-1987-014, :on 870912,automatic Initiation of 4 Kv Emergency Bus Degraded Voltage Protection Sys Occurred. Caused by Sys Design.Operating Procedure Changed to Require Performance of Load Transfer by Two Operators + (ML20235X152)
- IA-87-382, Final Response to FOIA Request.App a Documents Re Nuclear Export & Import Licensing Action Repts Available in PDR + (ML20235X153)
- ML20235X153 + (ML20235X153)
- ML20235X154 + (ML20235X154)
- ML20235X155 + (ML20235X155)
- IR 05000454/1989002 + (ML20235X159)
- ML20235X161 + (ML20235X161)
- ML20235X163 + (ML20235X163)
- ML20235X164 + (ML20235X164)
- ML20235X165 + (ML20235X165)
- 05000155/LER-1989-003, :on 880630,during Receipt Insp of Kerotest Globe Valve,Discovered That Valve Disc Assembly Rattled Inside Valve Body.Evaluation Implies That Overtorqued Condition Occurred After Shipment + (ML20235X166)
- ML20235X168 + (ML20235X168)
- ML20235X169 + (ML20235X169)
- ML20235X170 + (ML20235X170)
- ML20235X171 + (ML20235X171)
- ML20235X172 + (ML20235X172)
- ST-HL-AE-2301, Forwards Certification That 870518 Final Draft Tech Specs as Revised by 870707 Draft Page Changes,Consistent W/Fsar,Ser & as-built Facility.Final Draft Ready for Incorporation Into Ol,App a Tech Specs for Unit 1 + (ML20235X173)
- ML20235X176 + (ML20235X176)
- ML20235X177 + (ML20235X177)
- ML20235X178 + (ML20235X178)
- 0CAN048513, Responds to 850426 Telcon & Confirms Info Provided During Later Telcon on 850426 Re Actions Taken by Util to Restrict Use of North Gate at Plant + (ML20235X180)
- ML20235X181 + (ML20235X181)
- ML20235X183 + (ML20235X183)
- ML20235X184 + (ML20235X184)
- ML20235X185 + (ML20235X185)