ML20235X100
| ML20235X100 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/14/1987 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 4410-87-L-0151, 4410-87-L-151, 5211-87-2186, NUDOCS 8710190209 | |
| Download: ML20235X100 (5) | |
Text
_-
USNRC-DS GPU Nuclear Corporation 6,, u Nuclear
. m ocI 20 A 9 54 Ete E4ISUtY Middletown, Pennsylvania 17057 0191 717 944 7621 i
TELEX 84 2386 Writer's Direct Dial Number:
q
'l 1
October 14, 1987 5211-87-2186 4410-87-L-0151 J
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
)
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 and Unit 2 (TMI-1 and TMI-2)
Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 Emergency Plan Implementing Procedures In accordance with 10 CFR 50, Appendix E, Section V, Licensees are required to send Emergency Plan Implementing Procedures (EPIPs) to the NRC. Attachments 1 and 2 are listings of the EPIPs for TMI-l and TMI-2 respectively. These procedures are sent to you as revised under separate cover.
Sincerely, h
h H. D. Huk 1
Vice President & Director, TMI-l HDH/DVH/spb:1000A Attachments cc:
W. Russell G. Edison R. Conte 8710190209 e71014
/
PDR ADOCK 05000209
/ $O F
pon
/
\\
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
ATTACHMENT 1 TMI-l DOCKET 50-289 EMERGENCY PLAN IMPLEMENTING PROCEDURES PROCEDURE NUMBER TITLE i
6410-ADM-1300.01 Administration of the TMI-1 Initial Response and j
Emergency Support Organization Duty Roster i
6410- ADM-1300.02 Emergency Equipment Readiness 6410-ADM-1300.03 TMI-l EAL Basis and Cross Reference 6415-ADM-1300.01 Maintaining Emergency Preparedness
]
6415-ADM-1300.02 Emergency Preparedness Training l
6415-ADM-1300.03 Emergency Preparedness Drills 6410-IMP-1300.01 Emergency Classification 6410-IMP-1300.02 Emergency Direction 6410-IMP-1300.03 Emergency Offsite Notifications 6410-IMP-1300.04 Contact /Callout of Emergency Personnel 6415-IMP-1300.05 Communications and Record Keeping l
6415-IMP-1300.06 Additional Assistance and Notification l
6415-IMP-1300.07 Offsite and Onsite Dose Projections 6415-IMP-1300.09 In-plant Radiological Controls During Emergencies l
6415-IMP-1300.10 Onsite/Offsite Radiological / Environmental Monitoring 6415-IMP-1300.16 Contaminated Injuries 6415-IMP-1300.19 Emergency Dosimetry / Security Badge Issuance l
6415-IMP-1300.20 Personnel / Vehicle Monitoring and Decontamination 6415-IMP-1300.24 Recovery Operations 6415-IMP-1300.27 Activation of the Emergency Operations Facility 6410-IMP-1300.23 Activation of the Technical Support Center 6415-IMP-1300.29 OSC Operations _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _
- - =
ATTACHMENT 1 (CONTINUED) l PROCEDURE NUMBER TITLE I
i 6415-IMP-1300.30 Activation of the Environmental Assessment Command Center 6415-IMP-1300.32 Activation of the Annex to.the Emergency Operations i
Facility 1
6415-IMP-1300.35 Thyroid Blocking
]
6415-IMP-1300.36 Emergency Assembly Area
'l 9100-PLN-4200.02 TMI-1 Emergency Dosr Calculation Manual (EDCM).
8200-ADM-1720.02 Emergency Public. Information Plan and Implementing Procedure 5000-ADM-3054.01 Operations of the Parsippany Technical Functions-I Center i
I 1
4 j (
l
l ATTACHMENT 2 TMI-2 DOCKET 50-320 l
EMERGENCY PLAN IMPLEMENTING PROCEDURES PROCEDURE NUMBER TITLE i
1 6415-ADM-1300.01 Maintaining Emergency Preparedness l
6415-ADM-1300.02 Emergency Preparedness Training l
6415-ADM-1300.03 Emergency Preparedness Drills l
1 6420-ADM-1300.01 Administration of the TMI-2 Initial Response and
{
l Emergency Support Organization Duty Roster 6420-ADM-1300.02 Emergency Equipment Readiness 6420-IMP-1300.01 Emergency C1 ossification 6420-IMP-1300.02 Emergency Direction 6420-IMP-1300.03 Emergency Offsite Notifications 1
6420-IMP-1300.M Contact /Callout of Emergency Personnel l
6415-IMP-1300.05 Communications and Record Keeping l
6415-IMP-1300.06 Additional Assistance and Notification 6415-IMP-1300.07 Offsite and Onsite Dose Projections 6415-IMP-1300.09 In-Plant Radiological Controls During Emergencies 6415-IMP-1300,10 Onsite/0ffsite Radiological / Environmental Monitoring j
6415-IMP-1300.16 Contaminated Injuries 6415-IMP-1300.19 Emergency Dosimetry / Security Badge Issuance I
6415-IMP-1300.20 Personnel / Vehicle Monitoring and Decontamination 6415-IMP-1300.24 Recovery Operations 6415-IMP-1300.27 Activation of the Emergency Operations Facility 6420-IMP-1300.28 Activation of the Technical Support Center 6415-IMP-1300.29 OSC Operations l
~
ATTACHMENT 2 (CONTINUED) 1 PROCEDURE NUMBER TITLE 6415-IMP-1300.30 Activation of the Environmental Assessment Command Center 6415-IMP-1300.32 Activation of the Annex to the Emergency Operations Facility 6420-IMP-1300.34 Activation of the Recovery Technical Support Center 6415-IMP-1300.35 Thyroid Blocking l
6415-IMP-1300.36 Emergency Assembly Area l
8200-ADM-1720.02 Emergency Public Information Plan and Implementing-l Procedure 5000-ADM-3054.01 Operations of the Parsippany Technical Functions Center i
1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - - _ _ _ - _ _ _
- _ _ _