Clarifies Proprietary Nature of Selected Portions of CEN-348(B)-P, Extended Statistical Combination of Uncertainties Rept, in Response to NRC Request to Allow Inclusion of Portions of Rept in NRC-originated SER
ML20235X130
Person / Time
Site: Calvert Cliffs  
Issue date: 10/08/1987
From: Lippold W
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8710190223
Download: ML20235X130 (2)


Text

r

'*e '

.o

' BALTIMORE GAS AND USNRC-DS re1 0t n 9 A D Ly a.

. CHARLES CENTER.P. O. BOX 1476 BALTIMORE, MARYLAND 21203 W. JAMES LIPPOLD MANACsER HUCLEAR ENOWEENNO SERVICES oGPARTMENT

'U, S. Nuclear Regulatory Commission i

Washington, DC 20555

. ATTENTION:

Document Control Desk SUBJECf; Calvert Cliffs Nuclear Power Plant Unit Nos. ! & 2; Docket Nos. 50-317 & 50-318 Clarification of the Request for Approval of CEN-348(b)-P, Extended Statistical Combination of Uncertainties Report. January 1987

REFERENCES:

(a) CE Report, " Extended Statistical Combination of Uncertainties,"

CEN-348(B)-P, January 1987 (b) J. A. Tiernan (BG&E), to Document Control Desk, " Request for Ap-proval of CEN-348(B)-P, Extended Statistical Combination of Uncer-tainties Report," dated March 5,1987 (c) CE Report, " Statistical Combination of Uncertainties, Part 2",

CEN-124(B)-P, January 1980 (d) CE Report, " Statistical Combination of Uncertainties, Part 1 ",

CEN-124(B)-P, December 1979 3

i (e) CE Report, " Statistical Combination of Uncertainties, Part 3",

)

CEN-124(B)-P, March 1980 Gentlemen:

This letter is in response to an NRC request to clarify the proprietary nature of se-lected portions of Reference (a), such that portions thereof could be included in an NRC originated Safety Evaluation Report (SER) without risk of violating any proprietary agreement between the NRC., Baltimore Gas & Electric (BG&E), and Combustion Engineering (CE).

It is our understanding that the SER for Reference (b) is currently in preparation and that the following clarification is desired for its completion:

"The Extended Statistical Combination of Uncertainties Program in-l volves the statistical combination of several uncertainty components i

previously applied deterministically, including system parameter un-l certainties from Reference (c) and state parameter uncertainties from l

References (d) and (e). A 95/95 probability / confidence level is main-l tained with use of a DNB SAFDL of 1,15 in conjunction with the total uncertainty penalties derived from the methodology described in Refer-I ence (a)."

D 8710190223 071000 PDR ADOCK 05000317 P

PDR Ig

__-_-___a

i T-

)

i l'

^

l Document Control Desk October 8,1987 j

Page 2 1

l 1

The preceding paragraph is submitted in response to the portions of Reference (a) which l

were identified via telephone conference between the NRC, BG&E, and CE on i

September 11, 1987, as requiring an assurance that proprietary information would not be i

compromised. This paragraph may be used by the NRC without risk of any proprietary agreement violation.

i Very truly yours, l

Of#U WJL/DSE/gla.

cc:

D. A. Brune, Esquire J. E.

Silberg, Esquire R. A.Capra, NRC S. A. McNeil, NRC -

W. T. Russell, NRC T. Foley/D. C. Trimble, NRC T. Magette, DNR i