Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235U039 + (ML20235U039)
- ML20235U040 + (ML20235U040)
- ML20235U041 + (ML20235U041)
- ML20235U042 + (ML20235U042)
- ML20235U045 + (ML20235U045)
- ML20235U046 + (ML20235U046)
- ML20235U048 + (ML20235U048)
- ML20235U052 + (ML20235U052)
- TXX-6815, Advises That Due to Addl Delays Encountered in Performing Cable Rework Associated W/Ncr CE-87-7481,completion Date Revised to Be No Later than 871101,in Response to Violation Noted in Insp Repts 50-445/86-06 & 50-446/86-04 + (ML20235U056)
- ML20235U057 + (ML20235U057)
- ML20235U058 + (ML20235U058)
- ML20235U059 + (ML20235U059)
- ML20235U061 + (ML20235U061)
- ML20235U062 + (ML20235U062)
- ML20235U063 + (ML20235U063)
- ML20235U066 + (ML20235U066)
- ML20235U069 + (ML20235U069)
- ML20235U070 + (ML20235U070)
- ML20235U072 + (ML20235U072)
- ML20235U075 + (ML20235U075)
- ML20235U077 + (ML20235U077)
- ML20235U078 + (ML20235U078)
- ML20235U079 + (ML20235U079)
- ML20235U080 + (ML20235U080)
- ML20235U084 + (ML20235U084)
- ML20235U086 + (ML20235U086)
- ML20235U088 + (ML20235U088)
- ML20235U089 + (ML20235U089)
- ML20235U093 + (ML20235U093)
- ML20235U094 + (ML20235U094)
- ML20235U095 + (ML20235U095)
- ML20235U097 + (ML20235U097)
- ML20235U099 + (ML20235U099)
- JPN-87-038, Forwards Summary of Mods Completed During Reload 7 Refueling Outage.Dcrdr Control Room Enhancement Program Mods Not Completed.Program Rescheduled as Stated in + (ML20235U103)
- ML20235U107 + (ML20235U107)
- PNO-III-87-131, on 871007,util & Bechtel Power Corp Issued Joint Press Release Announcing Tentative Agreement to Form New Joint Venture Which Would Own & Operate Facility.Util Would Continue to Operate Facility Under Contract for 3 Yrs + (ML20235U111)
- ML20235U114 + (ML20235U114)
- 05000456/LER-1987-049, :on 870905,isotopic Analysis of Waste Gas Oxygen Analyzer Performed Rather than Required Oxygen Concentration.Caused by Programmatic Deficiency.Training Program Being Developed + (ML20235U116)
- ML20235U117 + (ML20235U117)
- PNO-II-87-046, on 870712,unusual Event Occurred When Unit Experienced Unidentified RCS Leakage in Excess of 1 Gpm Terminated.Leakage Determined to Be from 3/4 Inch Pressurizer Sample Valve Attached to PORV Relief Line + (ML20235U119)
- ML20235U121 + (ML20235U121)
- W3P85-1451, Advises That Initiation of Corrective Action or Other Appropriate Resolution for Deviations Identified During Insp Rept 50-382/84-25 Rescheduled for 850901 + (ML20235U123)
- ML20235U126 + (ML20235U126)
- ML20235U127 + (ML20235U127)
- ML20235U130 + (ML20235U130)
- ML20235U132 + (ML20235U132)
- PNO-V-87-065, on 871004,significant Aftershock Experienced from 871001 Earthquake.Aftershock Registered 5.5 on Richter Scale.Seismic Instruments Actuated at 0.014g at Unit 1.No Damage to Equipment Occurred + (ML20235U133)
- ML20235U134 + (ML20235U134)
- ML20235U135 + (ML20235U135)
- IR 05000244/1987021 + (ML20235U138)
- ML20235U139 + (ML20235U139)