Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235M816 + (ML20235M816)
- ML20235M819 + (ML20235M819)
- ML20235M820 + (ML20235M820)
- PNO-I-87-064, on 870711,reactor High Pressure Scram Experienced from Approx 3% Power.Caused by Fatigue Failure of Electrohydraulic Control Line to Turbine Control Valve 4. Repairs May Include Addl Structural Support + (ML20235M823)
- ML20235M827 + (ML20235M827)
- ML20235M829 + (ML20235M829)
- ML20235M830 + (ML20235M830)
- ML20235M832 + (ML20235M832)
- ML20235M834 + (ML20235M834)
- ML20235M836 + (ML20235M836)
- ML20235M839 + (ML20235M839)
- ML20235M844 + (ML20235M844)
- ML20235M848 + (ML20235M848)
- ML20235M850 + (ML20235M850)
- ML20235M852 + (ML20235M852)
- IR 05000461/1987002 + (ML20235M853)
- ML20235M855 + (ML20235M855)
- ML20235M858 + (ML20235M858)
- ML20235M862 + (ML20235M862)
- ML20235M863 + (ML20235M863)
- ML20235M866 + (ML20235M866)
- ML20235M869 + (ML20235M869)
- ML20235M871 + (ML20235M871)
- NLS8900051, Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Util Performs Quarterly Dewpoint Testing of Instrument Air Sys Which Demonstrates Consistent Dewpoint Below 32 F + (ML20235M872)
- ML20235M875 + (ML20235M875)
- ML20235M876 + (ML20235M876)
- ML20235M879 + (ML20235M879)
- ML20235M880 + (ML20235M880)
- ML20235M881 + (ML20235M881)
- ML20235M883 + (ML20235M883)
- ML20235M884 + (ML20235M884)
- ML20235M885 + (ML20235M885)
- ML20235M887 + (ML20235M887)
- 05000424/LER-1989-004, :on 890119,reactor Shutdown Initiated Due to RCPB Leakage from Rcs.Moisture Observed in Drain Valve for Pressurizer Safety Valve Loop Seal Line.Caused by Fatigue Failure Due to Vibration.Supports Added + (ML20235M891)
- ML20235M892 + (ML20235M892)
- ML20235M893 + (ML20235M893)
- 05000424/LER-1989-003, :on 890119,ESF Train B Chiller Removed from Svc for Calibr,Resulting in Entering Limiting Condition for Operation 1-89-032.Caused by Personnel Calibr Wrong Train. Train B Restored to Operable Status + (ML20235M895)
- ML20235M897 + (ML20235M897)
- ML20235M898 + (ML20235M898)
- ML20235M899 + (ML20235M899)
- ML20235M903 + (ML20235M903)
- ML20235M905 + (ML20235M905)
- ML20235M906 + (ML20235M906)
- IR 05000369/1987034 + (ML20235M907)
- ML20235M908 + (ML20235M908)
- ML20235M910 + (ML20235M910)
- ML20235M911 + (ML20235M911)
- 05000260/LER-1987-007-03, :on 870831,inboard Isolation Valve for Drywell Control Air Sys Did Not Close on Loss of Motive Air.Caused by Personnel Error.Valves Replaced & Actuators Will Be Modified to Meet Design Requirements + (ML20235M912)
- TXX-6798, Advises That Date for Achieving Full Compliance Revised to 871130 Instead of 870930,in Response to Deviations Noted in Insp Repts 50-445/87-02 & 50-446/87-02 + (ML20235M914)
- ML20235M915 + (ML20235M915)
- ML20235M922 + (ML20235M922)