Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216J707 + (ML20216J707)
- ML20216J708 + (ML20216J708)
- ML20216J710 + (ML20216J710)
- ML20216J711 + (ML20216J711)
- ML20216J713 + (ML20216J713)
- ML20216J715 + (ML20216J715)
- ML20216J717 + (ML20216J717)
- ML20216J719 + (ML20216J719)
- ML20216J720 + (ML20216J720)
- SVP-98-094, Provides Revised Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.Corrective Actions:Performed Instrument Error Analysis & Detailed Calculation to Determine Min Pressure Criteria & Revised Qcos 2900-01 + (ML20216J721)
- ML20216J724 + (ML20216J724)
- ML20216J726 + (ML20216J726)
- ML20216J728 + (ML20216J728)
- SVP-98-095, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-22 & 50-265/97-22.Corrective Actions:Procedure Qcop 2300-08 Was Walked Down & Verified by Sro,Corrected Procedure & Evaluated Effect of Longer Valve Closures Times + (ML20216J731)
- ML20216J732 + (ML20216J732)
- ML20216J733 + (ML20216J733)
- PNO-III-78-193, on 781109,received Allegation Re Qualification of Welders Performing Safe End Repair Work at Plant.State of IA Informed + (ML20216J736)
- ML20216J738 + (ML20216J738)
- ML20216J743 + (ML20216J743)
- NG-98-0458, Responds to Violations Noted in Insp Rept 50-331/98-02. Corrective Actions:Revised Applicable Plant Procedures Re Valves in Violation & Submitted TS Rev Which Will Provide Longer LCO for Drywell Cooling Return & Supply Valves + (ML20216J746)
- NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications + (ML20216J747)
- ML20216J749 + (ML20216J749)
- ML20216J750 + (ML20216J750)
- ML20216J753 + (ML20216J753)
- ML20216J756 + (ML20216J756)
- ML20216J757 + (ML20216J757)
- ML20216J758 + (ML20216J758)
- ML20216J759 + (ML20216J759)
- ML20216J762 + (ML20216J762)
- ML20216J763 + (ML20216J763)
- 2CAN039804, Discusses TS Bases Change Re Plant Protection Sys Matrix Logic Testing.Encl Revised Bases Page B 3/4 3-1a Should Be Issued Immediately Due to Increase in Current Channel Testing Frequency + (ML20216J764)
- ML20216J765 + (ML20216J765)
- ML20216J766 + (ML20216J766)
- NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr + (ML20216J768)
- ML20216J773 + (ML20216J773)
- ML20216J774 + (ML20216J774)
- ML20216J775 + (ML20216J775)
- ML20216J778 + (ML20216J778)
- ML20216J779 + (ML20216J779)
- ML20216J783 + (ML20216J783)
- ML20216J784 + (ML20216J784)
- ML20216J787 + (ML20216J787)
- 0CAN049803, Responds to Violations Noted in Insp Rept 50-313/97-21 & 50-368/97-21.Corrective Actions:Temporary Alteration Package to Document three-inch Flanged Gap FME Cover Was Completed on 970218 + (ML20216J788)
- ML20216J789 + (ML20216J789)
- ML20216J790 + (ML20216J790)
- ML20216J791 + (ML20216J791)
- ML20216J792 + (ML20216J792)
- ML20216J793 + (ML20216J793)
- ML20216J794 + (ML20216J794)
- ML20216J801 + (ML20216J801)
- ML20216J805 + (ML20216J805)