Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216J667 + (ML20216J667)
- ML20216J670 + (ML20216J670)
- ML20216J672 + (ML20216J672)
- ML20216J673 + (ML20216J673)
- 05000461/LER-1987-030, :on 870605,RWCU Sys Automatically Isolated. Caused by Feedwater Flow/Pressure Sensitivity to Flow/ Pressure Perturbations.Sys Remained Isolated Until Feedwater Flow Manipulations Complete & Flow Stabilized + (ML20216J674)
- IR 05000424/1998002 + (ML20216J675)
- ML20216J676 + (ML20216J676)
- BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 + (ML20216J677)
- ML20216J678 + (ML20216J678)
- ML20216J679 + (ML20216J679)
- ML20216J680 + (ML20216J680)
- ML20216J681 + (ML20216J681)
- 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 + (ML20216J682)
- ML20216J685 + (ML20216J685)
- ML20216J686 + (ML20216J686)
- ML20216J687 + (ML20216J687)
- ML20216J689 + (ML20216J689)
- ML20216J690 + (ML20216J690)
- ML20216J693 + (ML20216J693)
- ML20216J694 + (ML20216J694)
- ML20216J695 + (ML20216J695)
- ML20216J700 + (ML20216J700)
- ML20216J702 + (ML20216J702)
- PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H + (ML20216J703)
- ML20216J704 + (ML20216J704)
- ML20216J707 + (ML20216J707)
- ML20216J708 + (ML20216J708)
- ML20216J710 + (ML20216J710)
- ML20216J711 + (ML20216J711)
- ML20216J713 + (ML20216J713)
- ML20216J715 + (ML20216J715)
- ML20216J717 + (ML20216J717)
- ML20216J719 + (ML20216J719)
- ML20216J720 + (ML20216J720)
- SVP-98-094, Provides Revised Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.Corrective Actions:Performed Instrument Error Analysis & Detailed Calculation to Determine Min Pressure Criteria & Revised Qcos 2900-01 + (ML20216J721)
- ML20216J724 + (ML20216J724)
- ML20216J726 + (ML20216J726)
- ML20216J728 + (ML20216J728)
- SVP-98-095, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-22 & 50-265/97-22.Corrective Actions:Procedure Qcop 2300-08 Was Walked Down & Verified by Sro,Corrected Procedure & Evaluated Effect of Longer Valve Closures Times + (ML20216J731)
- ML20216J732 + (ML20216J732)
- ML20216J733 + (ML20216J733)
- PNO-III-78-193, on 781109,received Allegation Re Qualification of Welders Performing Safe End Repair Work at Plant.State of IA Informed + (ML20216J736)
- ML20216J738 + (ML20216J738)
- ML20216J743 + (ML20216J743)
- NG-98-0458, Responds to Violations Noted in Insp Rept 50-331/98-02. Corrective Actions:Revised Applicable Plant Procedures Re Valves in Violation & Submitted TS Rev Which Will Provide Longer LCO for Drywell Cooling Return & Supply Valves + (ML20216J746)
- NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications + (ML20216J747)
- ML20216J749 + (ML20216J749)
- ML20216J750 + (ML20216J750)
- ML20216J753 + (ML20216J753)
- ML20216J756 + (ML20216J756)
- ML20216J757 + (ML20216J757)