Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1986-071, :on 861004,two post-accident Sample Sys Valves Failed to Pass Local Leak Rate Testing.Caused by Lack of Detail on Isometric Drawings.Isometric Drawings Revised to Provide Necessary Detail Re Flow Direction + (ML20215N575)
- ML20215N576 + (ML20215N576)
- ML20215N577 + (ML20215N577)
- NUREG-0876, Advises That Preservice Insp Program,Described in Util 860723,0902,30 & 1016 Ltrs,Acceptable & in Compliance W/ 10CFR50.55a(g)(3).Safety Evaluation Will Be Included in Sser 7 (NUREG-0876) + (ML20215N579)
- ML20215N580 + (ML20215N580)
- ML20215N581 + (ML20215N581)
- ML20215N582 + (ML20215N582)
- ML20215N583 + (ML20215N583)
- ML20215N585 + (ML20215N585)
- ML20215N586 + (ML20215N586)
- ML20215N588 + (ML20215N588)
- ML20215N591 + (ML20215N591)
- ML20215N592 + (ML20215N592)
- IR 05000267/1986035 + (ML20215N595)
- ML20215N597 + (ML20215N597)
- ML20215N598 + (ML20215N598)
- ML20215N600 + (ML20215N600)
- ML20215N603 + (ML20215N603)
- ML20215N604 + (ML20215N604)
- ML20215N605 + (ML20215N605)
- ML20215N606 + (ML20215N606)
- ML20215N608 + (ML20215N608)
- ML20215N612 + (ML20215N612)
- ML20215N614 + (ML20215N614)
- ML20215N616 + (ML20215N616)
- ML20215N617 + (ML20215N617)
- B12300, Requests NRC Provide Written Statement of Concurrence Re Util Conclusion That One Insp Port Upstream of Venturi Adequate for Insp & Cleaning to Prevent Deposits Over Svc Lifetime.Fee Paid + (ML20215N618)
- IR 05000456/1986053 + (ML20215N619)
- ML20215N620 + (ML20215N620)
- ML20215N621 + (ML20215N621)
- ML20215N622 + (ML20215N622)
- ML20215N623 + (ML20215N623)
- ML20215N625 + (ML20215N625)
- B12306, Forwards Addl Info on SPDS Isolation Devices,Per NRC 860211 Request.Encl Info Describes Addl Testing Performed + (ML20215N627)
- ML20215N628 + (ML20215N628)
- ST-HL-AE-1796, Forwards Annotated Changes to FSAR & Revised Responses to NRC Questions Providing Results of Internal Flooding Analysis/Evaluation.Consequences of Flooding Inside Reactor Makeup Water Sys Acceptable.Related Correspondence + (ML20215N630)
- ST-HL-AE-1793, Forwards WCAP-11327 & WCAP-11328, Cumulative Usage Factor Criterion for Break Postulation for South Texas Units 1 & 2, Per NRC Request.Repts Withheld (Ref 10CFR2.790).Related Correspondence + (ML20215N631)
- L-86-446, Informs That plant-specific ATWS Submittal Will Be Prepared by 870715.Implementation Schedule Will Be Developed After NRC Review + (ML20215N632)
- ML20215N633 + (ML20215N633)
- ML20215N636 + (ML20215N636)
- ML20215N637 + (ML20215N637)
- B12250, Forwards Reviews for Isap Topics 1.24, Tech Spec Surveillance for Hydraulic Snubbers, 1.25, Tech Spec Surveillance for Mechanical Snubbers & 1.46, Inservice Testing for Diesel Generator Auxiliaries + (ML20215N638)
- ML20215N639 + (ML20215N639)
- ML20215N641 + (ML20215N641)
- ST-HL-AE-1790, Forwards Responses to SER Open Item 7 Re Isolation Device Test Rept for Electrical Devices.Related Correspondence + (ML20215N642)
- ML20215N644 + (ML20215N644)
- CLI-86-21, Order CLI-86-21,denying Applicant Petition for Review of Aslab Decision ALAB-817,dismissing Motion for Directed Certification.No Further Filing on Subj Will Be Entertained. Served on 861106 + (ML20215N646)
- ML20215N647 + (ML20215N647)
- ML20215N649 + (ML20215N649)
- GO2-86-097, Responds to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps.Each RHR Sys Has Separate Min Flow Valve & Return Line.Hpcs & Lcps Sys Also Have Separate Min Flow Recirculation Lines + (ML20215N650)
- ML20215N651 + (ML20215N651)