ML20215N606
| ML20215N606 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/29/1986 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20215N607 | List: |
| References | |
| NUDOCS 8611070070 | |
| Download: ML20215N606 (2) | |
See also: IR 05000456/1986053
Text
pp .
2
,
QA E mi l A O n o v a ' r A ru n n -
y
'
..
vn
._uunstvo stu w man,
.
OCT 291986
Docket No. 50-456
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the preoperational physical protection inspection conducted
by Messrs. J. L. Belanger and J. R. Kniceley, and Ms. G. M. Christoffer of
this office on September 29-30, October 1-3, 7-9, and 14, 1986 of activities
at the Braidwood Nuclear Power Station, Unit I authorized by NRC Construction
Permit No. CPPR-132 and to the discussion of our findings with
Mr. E. E. Fituatrick at the conclusion of the inspection.
The enclosed c
/ of our inspection report identifies areas examined during
the inspectior.
Within these areas, the inspection . consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
The inspection showed that the minimum requirements of the security program
are being met; therefore, the program is adequate to support fuel load. No
violations of NRC requirements were identified during the
urse of this
inspection.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10'CFR 73.21.
Consequently, our report
of this inspection will not be'placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
(
g[0 DO
50
56 /
. L. Axe son, Chief
a
PDR J
uclear Materials Safety
I
and Safeguards Branch
Enclosure: -Inspection Report
No. 50-456/86053(DRSS)
t
(UNCLASSIFIED SAFEGUARDS INFORMATION)
I
<
See Attached Distribution
f
f
\\
1
'U1
RIII
RIII
RIII
s
7
II
ny
G
"p
g
/
y
,
Belanger/ls
Kniteley
Christoffer
r l)d
L ttle
L
h Mosurecontains
\\
-
}
Cl#EGUARDS INFORMATION
__
"
v/OUd llRUhMAllUl;
,,,,-
u n senration this
s
i
page is Dem ntrolled
._.
-
_ _ _ _
m
' x
O A
~ ~/il l A n h O Im rnnRR A-" A
un
_u ur st i tJ V iria v ativs/1
U
g gg $86
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Ar,surance Supervisor
IE FILE
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
' Division
E. Chan, ELD
J. Moore, ELD-
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
i
1
O A rrnii A nno IMrnpU AT O 1
Enclos m contains
SAFEGUARDSIfjFORMATIOR
o n e L U U tiis u v
is..
-,,,,,m
,
Upon separation this
page is Decontrolled