ML20215N576

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Facility License DPR-21,authorizing Operation at steady-state Reactor Core Power Levels Not in Excess of 2,011 Mwt & Superseding Provisional OL in Entirety
ML20215N576
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/31/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20215N573 List:
References
NUDOCS 8611070011
Download: ML20215N576 (3)


Text

'

j# "*%k UNITED STATES

.ex)$y.

NUCLEAR REGULATORY COMMISSION

$ f o

m%; %s j' WASHINGTON, D. C. 20555 NOTICE OF ISSUANCE OF FACILITY OPERATING LICENSE NO. DPR-21 NORTHEAST NUCLEAR ENERGY COMPANY MILLSTONE NUCLEAR POWER STATION, UNIT N0. 1 DOCKET N0. 50-245 The U. S. Nuclear Regulatory Comission (the Comission) has issued Facility Operating License No. DPR-21 to Northeast Nuclear Energy Company, acting for itself and as agent for the Connecticut Light and Power Company and Western Massachusetts Electric Company, authorizing operation of the Millstone Nuclear Power Station, Unit 1, (Millstone Unit 1) at steady-state reactor core power levels not in excess of 2011 megawatts (thermal), in accordance with the provisions of the license and the technical specifications.

Millstone. Unit 1 is a boiling water reactor located in Waterford, Connecticut.

The Millstone Unit I reactor has operated since October 7, 1970, under Provisional Operating License No. DPR-21.

Facility Operating License No.DPR-21 supersedes Provisional Operating License'No. DPR-21 in its entirety.

Notice of Consideration of Conversion of Provisional Operating License to Full-Term Operating License and Opportunity for Hearing was published in the FEDERAL REGISTER on-November 28, 1972 (37 FR 25187). The full-term operating license was not issued previously pending cempletion of the reviews under the Systematic Evaluation Program (NUREG-0824, February 1983),

and by the Advisory Committee on Reactor Safeguards. The Final Environmental Statement (FES) connected with the conversion to a full-term operating license was issued in June 1973. A Notice of Availability of the FES was published in the FEDERAL REGISTER on June 4, 1973, (38 FR 14699).

Because the FES was issued a number of years ago, the staff per'ormed an environ-mental assessment to determine if a FES supplement was necessary. This assessment dated December 17, 1984, concluded that a FES supplement was not necessary.

This conclusion was noticed in the FEDERAL REGISTER on December 26, 1984 (49 FR 50131).

pgA228!i8th8jk P

. The application for the full-term operating license complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations in 10 CFR Chapter I, as set forth in the license.

The Commission has determined that the issuance of this license will not result in any environmental impacts other than those evaluated in the Final Environmental Statement, since the activity authorized by the license is encompassed by the overall action evaluated in the Final Environmental Statement.

Facility Operating License DPR-21 is effective as of its date of issuance and shall expire May 19, 2006.

For further information concerning this action see:

(1) the licensee's

/

application for a full-term operating license dated September, 1, 1972, (2) the Final Environmental Statement (June 1973), (3) the Commission's Environmental Assessment, dated December 17,1984,(4) Facility Operating License No. DPR-21 with Appendix A, Technical Specifications, and (5) the Safety Evaluation Report

~

(NUREG-1143) dated October 1985, and Supplement 1 to this report, which are available for public inspection at the Comission's Public Document Room, 1717 H Street, N.W., Washington, D.C., and at the Waterford Public Library, 49 Rope Ferry Road, Waterford, Connecticut 06385.

~ '

A cop'y of Facility Operating License DPR-21 may be obtained upon request a,ddressed to the U.S. Nuclear Regulatory Comission, Washington, D.C.

20555, Attentibn:~' Director, Division of Licensing.

Copies of the Safety Evaluation JReportil(NUREG-1143)andSupplement1tothisreportmaybepurchasedthrough the U.S.' Government Printing Office by calling (202)275-2060, or by writing to the U.S. Government Printing Office, Post Office Box 37082, Washington, D.C.

20013-7082. Copies may also be purchased from the National Technical Information Service, U.S. Department of Comerce, 5285 Port Royal Road, s

v e

s o.

y 7

. Springfield, Virginia 22161. A copy is available fo inspection and/or copying for a fee in the NRC Public Document Room,1717 H Street, N.W.,

Washington, D.C.

20555.

OL Frank J.. irag i, Director Division _of PWR Licensing - B Dated at.Bethesda, Maryland this 31sfiday of October 1986

)

t 4

)

i

, I e

L p

o f i

(

)

iI

-