ML20215N647
| ML20215N647 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/28/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Walker R PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20215N648 | List: |
| References | |
| NUDOCS 8611070122 | |
| Download: ML20215N647 (2) | |
Text
F h
(C wo
.In Reply Refer To:
Docket: 50-267/0L 86-02 OCT 281986 Public Service Company of Colorado ATTN:
Richard N. Walker Vice President
- P. O. Box 840 -
Denver, Colorado 80201 Gentlemen:
SUBJECT:
REQUALIFICATION PROGRAM AUDIT AND SENIOR REACTOR OPERATOR LICENSING EXAMINATION REPORT (OL 86-02)
During the week of September 15, 1986, NRC administered six Senior Reactor-Operator license examinations and eleven Requalification Program Audit examinations (two Reactor Operator and nine Senior Reactor Operator) at Fort St. Vrain Nuclear Facility.
The results of this site visit have been discussed with members of your staff.
Four of the six license candidates successfully completed their examinations and have been~ issued the appropriate license. Ten of the eleven licensed
-individuals evaluated passed the NRC-administered requalification program audit-examinations. Combining these results with those from the May examinations, 74 percent of the licensed. individuals evaluated passed the NRC-administered requalification program audit examinations during 1986. The~ excellent results of the oral examinations, ongoing facility efforts to improve the training program and facility management response to the May results, as well:as.results on recent license examinations, indicate substantial improvement in the operator training program. Therefore, the Fort St.'Vrain Requalification
' Program is now evaluated as satisfactory.
As a result, the restrictions imposed on license renewal.in our report OL 86-01, transmitted to you in an August 4,1986 letter, are no longer required.
Operator license renewals may now be granted based on facility certification of completion of the requalification-program.
Based on these results, NRC plans
-RIV:RSB/0L OL M
RSB RPB JPelletail RCooley TWesterman JGagl 10/e/86 10/%/86 10/2f/86 10/p; p
8611070122 861028 l\\
PDR ADOCK 05000267 V
PDR k
r --
v: p Public Service Company of Colorado -
2 to reevaluate the' Fort St. Vrain Requalification Program during'the.1987--
r requalification cycle to assure that the ability of operators to safely operate and shutdown' the facility is being satisfactorily maintained.
If you have any questions concerning this letter, please contact us.
?
Sincerely Original Sig*id Bk J. E. Gagliardo, Chief Reactor Projects Branch
~
Enclosure:
. Examination Report OL 86-02 cc w/ enclosures:
J. W. Gahm, Manager, Nuclear L. Singleton, Manager Production Division Quality Assurance Division Fort-St. Vrain Nuclear Facility;
-(sameaddre'ss) 16805 Weld County Road 19 1/2 I.
Platteville,; Colorado ~80651 S. Willford, Training Manager (sameaddress)
. COLORADO STATE DEPT HEALTH
~k ec to DMB (IE42) b bec distrib.-by RIV:
RPB
- R.
Farrell, RI R. D.- Martin,-RA RSB-J. Jaudon, PSA E. Johnson, DRS&P
- EP&RPB.
R. Ireland, ES
+ R.= Cooley
[
RIV File E.-Haycraft, OLS h. Pellet, OLS D.: Weiss,LFMB(AR-2015).
l
'K. Heitner, ORB 3 p.Eaton,OLB(AR-5221)
J. Buzy. HFMT (AR-5003).
1
(
?
s
.... ~ ~
- -,.