ML20215N586
| ML20215N586 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/04/1986 |
| From: | Long W Office of Nuclear Reactor Regulation |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20215N587 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 TAC-64721, NUDOCS 8611070034 | |
| Download: ML20215N586 (2) | |
Text
-_
November 4, 1986 g
g Dock'et No. 50-298 Mr. J. M. Pflant, Technical Staff Manager Nuclear Power. Group Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601
Dear Mr. Pflant:
=
SUBJECT:
DETAILED CONTROL ROOM DESIGN REVIEW - SAFETY EVALUATION Re:
Cooper Nuclear Station Enclosed is the staff's Detailed Control Room Design Review (DCRDR) Safety Evaluation (SE), resulting from review of your February 27, 1986 Supplemental Sumary Report and from the May 13-16, 1986 preimplementation audit. A copy of the Technical Evaluation Report prepared by the staff's technical assistance contractor, the Lawrence Livermore National Laboratory, is attached to the SE.
The SE concludes that the DCRDR is incomplete and identifies the activities required for completion. You are requested to submit an additional Supplemental Summary Report by January 31, 1987, as described in the SE.
Sincerely
')1 C?ak. '
William 0. Long, Project Manager BWR Project Directorate #2 Division of BWR Licensing
Enclosure:
As stated cc: w/ enclosure Next page DISTRIBUTION.
Docitet J11es B. Grimes NRC PDR J. Partlow Local PDR N. Thompson PD#2 Reading W. Long RMBernero S. Norris OGC-Bethesda ACRS(10)
E. Jordan 0FFICIAL RECORD COPY PD. DBL PD#2/DBLF PDAS/k 5
is WLong/cd DBdiler
// /i /86 is/q/86 f / /g/86 e611070034 861104 PDR ADOCK 05000298 E
t Mr. J. M. Pilant Nebraska Public Power District Cooper Nuclear Station cc:
Mr. G. D. Watson, General Counsel Nebraska Public Power District Post Office Box 4999 Columbus, Nebraska 68601 Mr. Arthur C. Gehr Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. G. Horn, Division Manager of Nuclear Operations Post Office Box 98 Brownville, Nebraska 68321-Director Nebraska Department of Environmental Control Post Office Box 94877 State House Station Lincoln, Nebraska 68509 Mr. William Siebert, Commissioner Nemaha County Board of Commissioners Nemaha County Courthouse Auburn, Nebraska 68305 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 H. Ellis Simmons, Director Division of Radiological Health Department of Health 301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 W