Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215M869 + (ML20215M869)
- ML20215M871 + (ML20215M871)
- ML20215M873 + (ML20215M873)
- ML20215M874 + (ML20215M874)
- ML20215M875 + (ML20215M875)
- ML20215M877 + (ML20215M877)
- ML20215M879 + (ML20215M879)
- ML20215M880 + (ML20215M880)
- ML20215M881 + (ML20215M881)
- ML20215M882 + (ML20215M882)
- ML20215M883 + (ML20215M883)
- ML20215M884 + (ML20215M884)
- ML20215M885 + (ML20215M885)
- ML20215M887 + (ML20215M887)
- ML20215M888 + (ML20215M888)
- ML20215M889 + (ML20215M889)
- ML20215M890 + (ML20215M890)
- ML20215M891 + (ML20215M891)
- ML20215M892 + (ML20215M892)
- IR 05000329/1986001 + (ML20215M894)
- ML20215M895 + (ML20215M895)
- ML20215M898 + (ML20215M898)
- ML20215M899 + (ML20215M899)
- ML20215M900 + (ML20215M900)
- ML20215M902 + (ML20215M902)
- IR 05000275/1986022 + (ML20215M903)
- ML20215M904 + (ML20215M904)
- ML20215M906 + (ML20215M906)
- ST-HL-AE-1789, Requests That Scope of Fog Monitoring Program Be Reviewed as Soon as Possible to Support Program Initiation in Dec 1986. Fog Monitoring Will Be Accomplished by Operation of Two Fog Visiometers,Per Fes (NUREG-1171) Section 5.13.3 + (ML20215M907)
- TXX-6072, Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219 + (ML20215M908)
- ML20215M910 + (ML20215M910)
- ML20215M912 + (ML20215M912)
- ML20215M913 + (ML20215M913)
- DCL-86-310, Ack Receipt of 861016 SALP Rept.Meeting Unnecessary to Discuss Results of Rept.Salp Board Recommendations Will Be Considered in Continuing Mgt Review of Facility Performance + (ML20215M914)
- ML20215M915 + (ML20215M915)
- ML20215M916 + (ML20215M916)
- ML20215M917 + (ML20215M917)
- U-600752, Submits Final Quarterly Update on Const Schedule,Per Recipient .Const Complete.License NPF-55 Issued for Facility on 860929 + (ML20215M918)
- 05000316/LER-1986-027, :During 860802-29,backup Tritium Sample Sys Removed from Svc While Primary Sys Removed from Svc on 860806.Caused by Inadequate Procedural Guidance.Procedural Controls Adopted + (ML20215M922)
- ML20215M923 + (ML20215M923)
- ML20215M924 + (ML20215M924)
- ML20215M925 + (ML20215M925)
- ML20215M926 + (ML20215M926)
- ML20215M927 + (ML20215M927)
- 05000374/LER-1986-006-01, :on 860302,RWCU a Filter Sys Isolated on High Differential Flow.Caused by Procedural Error & Damaged Inboard Isolation Valve 2G33-F001 Motor.Procedures Revised & Motor Replaced + (ML20215M928)
- ML20215M929 + (ML20215M929)
- ML20215M932 + (ML20215M932)
- FVY-86-100, Advises That Util Will Install Manual Inhibit Switch in Conjunction W/Timer to Bypass High Drywell Pressure Permissive After Sustained Low Water Level,Per NUREG-0737, Item II.K.3.18 + (ML20215M933)
- ML20215M934 + (ML20215M934)
- ML20215M935 + (ML20215M935)
- ML20215M937 + (ML20215M937)