ML20215M884

From kanterella
Jump to navigation Jump to search
Informs That Steam Generator Plugging for Current Refueling Outage Completed on 860810.Once-Through Steam Generator (OTSG) a Not Inspected.Otsg B Has Seven Tubes Removed from Svc by Plugging
ML20215M884
Person / Time
Site: Oconee 
Issue date: 10/21/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8611030408
Download: ML20215M884 (1)


Text

Dihb DUKE POWER GOMPANY P.O. Box 33180 CHAMLOTTE, N.C. 28242 HALH.TUCKEH o"Ii 0CT 21 a 9 : 0 6 October 21, 1986 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Consnission - Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Ga.

30323 Subj ect: Oconee Nuclear Station, Unit 3 Docket Nos. 50-287 OTSG Tube Plugging De.st fly Grace:

Pursuant t6 Oconee Nuclear Station Technical Specification 4.17.6(a) Duke Power Company (Duke) is providing the following information concerning the Oconee Unit 3 steam generators. The steam generator plugging for the current Unit 3 refueling outage was completed on August 10, 1986. The "A" OTSG was not inspected. The "B" OTSG had a total of seven (7) tubes removed from service by plugging.

Very truly yours, f

<,<-a l

Hal B. Tucker I

PJN/84/jgm Attachments l

xc:

Mr. Harold R. Denton I

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 l

Ms. Helen Pastis l

Office of Nuclear Reactor Regulation l

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 l

Mr. J.C. Bryant NRC Resident Inspector O

Oconee Nuclear Station g l/

l 8611030408 861021

.y 4

gg);. y. g - - v ~ 'N ADOCK0500g7 PDR P

gy, g,s

..g

.n