Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215M831 + (ML20215M831)
- ML20215M833 + (ML20215M833)
- IR 05000322/1986017 + (ML20215M835)
- IR 05000334/1986021 + (ML20215M839)
- ML20215M840 + (ML20215M840)
- BECO-86-063, Semiannual Marine Ecology Rept 28,Jan-June 1986s + (ML20215M846)
- IR 05000302/1986022 + (ML20215M852)
- ML20215M854 + (ML20215M854)
- ST-HL-AE-1703, Responds to IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps. Design Change Implemented to Provide Continuous Temp Monitoring of Auxiliary Feedwater Piping to Detect Backleakage of Hot Water + (ML20215M855)
- NRC-86-3173, Forwards Nonproprietary & Proprietary RESAR-SP/90 Westinghouse Advanced PWR Std Plant Design,Module 15, Control Room/Human Factors Engineering. Proprietary Version Withheld (Ref 10CFR2.790) + (ML20215M858)
- 05000413/LER-1986-050, :on 860916,fuel Pool Ventilation Sys Inoperable.Caused by Blocked Open Doors.Reinforced Polyethylene Sheets Installed Over Vents & Doors Ax 6350 & CAD 612 Closed to Restore Sys Operability + (ML20215M859)
- ML20215M862 + (ML20215M862)
- ML20215M863 + (ML20215M863)
- IR 05000324/1986026 + (ML20215M867)
- ML20215M868 + (ML20215M868)
- ML20215M869 + (ML20215M869)
- ML20215M871 + (ML20215M871)
- ML20215M873 + (ML20215M873)
- ML20215M874 + (ML20215M874)
- ML20215M875 + (ML20215M875)
- ML20215M877 + (ML20215M877)
- ML20215M879 + (ML20215M879)
- ML20215M880 + (ML20215M880)
- ML20215M881 + (ML20215M881)
- ML20215M882 + (ML20215M882)
- ML20215M883 + (ML20215M883)
- ML20215M884 + (ML20215M884)
- ML20215M885 + (ML20215M885)
- ML20215M887 + (ML20215M887)
- ML20215M888 + (ML20215M888)
- ML20215M889 + (ML20215M889)
- ML20215M890 + (ML20215M890)
- ML20215M891 + (ML20215M891)
- ML20215M892 + (ML20215M892)
- IR 05000329/1986001 + (ML20215M894)
- ML20215M895 + (ML20215M895)
- ML20215M898 + (ML20215M898)
- ML20215M899 + (ML20215M899)
- ML20215M900 + (ML20215M900)
- ML20215M902 + (ML20215M902)
- IR 05000275/1986022 + (ML20215M903)
- ML20215M904 + (ML20215M904)
- ML20215M906 + (ML20215M906)
- ST-HL-AE-1789, Requests That Scope of Fog Monitoring Program Be Reviewed as Soon as Possible to Support Program Initiation in Dec 1986. Fog Monitoring Will Be Accomplished by Operation of Two Fog Visiometers,Per Fes (NUREG-1171) Section 5.13.3 + (ML20215M907)
- TXX-6072, Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219 + (ML20215M908)
- ML20215M910 + (ML20215M910)
- ML20215M912 + (ML20215M912)
- ML20215M913 + (ML20215M913)
- DCL-86-310, Ack Receipt of 861016 SALP Rept.Meeting Unnecessary to Discuss Results of Rept.Salp Board Recommendations Will Be Considered in Continuing Mgt Review of Facility Performance + (ML20215M914)
- ML20215M915 + (ML20215M915)
- ML20215M916 + (ML20215M916)