Informs That Facilities Early Warning Sys (EWS) Consolidated Under Sys Maint Support Group.North Anna EWS Full Activation Testing Changed from Monthly to Quarterly.Sys Cancel Test Will Continue to Be Conducted Twice Monthly
ML20215M862
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 10/22/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
86-671, NUDOCS 8611030379
Download: ML20215M862 (2)


Text

,

bM6 VINGINIA ELECTHIC AND l'OWER COMI*ANY Hic aixoxn, Vi no ns A 2!!261 2d M S w.t..sra n =r Vara Panasomar Nrctuan OPRRATIONS Dr. J. Nelson Grace Serial No.86-671 Regional Administrator N0/ REB /jmj:LM12-611 Region II Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 101 Marietta Street, Suite 2900 50-338 Atlanta, Georgia 30323 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7

Dear Dr. Grace:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY AND NORTH ANNA POWER STATT0E EARLY WARNING SYSTEM TESTING The maintenance programs for the Early Warning Systems (EWS) at North Anna and Surry Power Stations have been consolidated under our System Maintenance Support group.

This was done in an effort to standardize maintenance for the Early Warning Systems. The next step in our effort to standardize EWS maintenance is to standardize the testing of the systems at both stations.

Currently, a full activation test of the North Anna EWS is conducted monthly, and PM checks (growl test) are conducted quarterly.

Full activation testing cf the Surry EWS is conducted quarterly and PM checks (growl test) conducted monthly.

These differing test schedulcs were originally developed to accommodate the desires of ' specific local jurisdictions while at the same time complying with the siren testing guidance outlined in NUREG-0654.

After consultation with State and local government officials, we are changing the North Anna EWS full activation testing from monthly to quarterly with associated monthly PM checks to be consistent with the Surry EWS testing schedule.

Specifically, the quarterly full activation testing for the North Anna EWS would be conducted on the third Wednesday of March, June, September, and December, while the Surry EWS testing will continue to be conducted on the second Wednesday of March, June, September, and December.

g' o {

861103o379 861022

/~

m -A'*d PDR ADOCK OS000280 e==-w =-mo

)%

M'

Dr. J. N:.lson Grace Monthly full activation testing of the North Anna EWS will continue through December 17, 1986. The first quarterly full activation test for 1987 will be March 18, 1987.

A revised testing schedule will be published in the 1987 North Anna emergency planning information calendar which will be distributed during December 1986.

The system "cance' test" will continue to be conducted twice monthly for each station as presently scheduled.

If you have any questions or need additional information, please contact Mr. R. J. Hardwick at 771-4468.

j Very truly yours, D

W. L. Stewart cc: Mr. A. E. Slayton, Jr.

State Coordinator Department of Emergency Services Mr. G. O'N. Urquhart Chief Radiological Planning Branch Department of Emergency Services Mr. M. M. Cline Director, Operations Division Department of Emergency Services l

!