Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215M469 + (ML20215M469)
- IA-87-216, Submits Daily Highlight.On 870311,while Unit 1 Cooled Down from Hot Functional Test,Severe Water Hammer Event Occurred in RHR Sys Hx.Caused by Operator Apparently Missing Step in Procedure.News Release & Related Info Encl + (ML20215M470)
- ML20215M470 + (ML20215M470)
- ML20215M473 + (ML20215M473)
- ML20215M474 + (ML20215M474)
- ML20215M475 + (ML20215M475)
- ML20215M477 + (ML20215M477)
- ML20215M479 + (ML20215M479)
- ML20215M480 + (ML20215M480)
- ML20215M482 + (ML20215M482)
- ML20215M483 + (ML20215M483)
- ML20215M486 + (ML20215M486)
- 05000338/LER-1987-007-01, :on 870422,during Mode 5,RHR Sys Temporarily Lost When Power Lost on 120-volt Ac Vital Bus 1-III.Caused by Blown Fuse Resulting in Inverter Failure.Tech Spec Will Be Changed to Eliminate RHR Interlock + (ML20215M487)
- ML20215M488 + (ML20215M488)
- ML20215M489 + (ML20215M489)
- IR 05000271/1986017 + (ML20215M491)
- ML20215M492 + (ML20215M492)
- ML20215M493 + (ML20215M493)
- ML20215M494 + (ML20215M494)
- ML20215M495 + (ML20215M495)
- AECM-86-0342, Forwards Addl Info for 860902 Proposed Amend to OL Re Transition to Sys Energy Resources,Inc,Per 861002 Meeting & 861004 & 13 Correspondence.Info Deals W/Switchyard & Exclusion Area Control & Emergency Planning + (ML20215M497)
- ML20215M498 + (ML20215M498)
- ML20215M499 + (ML20215M499)
- ML20215M501 + (ML20215M501)
- ML20215M502 + (ML20215M502)
- ML20215M504 + (ML20215M504)
- ML20215M505 + (ML20215M505)
- IR 05000285/1987008 + (ML20215M506)
- ML20215M509 + (ML20215M509)
- IR 05000313/1987004 + (ML20215M512)
- ML20215M514 + (ML20215M514)
- ML20215M515 + (ML20215M515)
- ML20215M516 + (ML20215M516)
- ML20215M517 + (ML20215M517)
- ML20215M519 + (ML20215M519)
- ML20215M520 + (ML20215M520)
- ML20215M521 + (ML20215M521)
- IR 05000295/1987006 + (ML20215M523)
- ML20215M524 + (ML20215M524)
- ML20215M525 + (ML20215M525)
- ML20215M526 + (ML20215M526)
- ML20215M527 + (ML20215M527)
- ML20215M528 + (ML20215M528)
- ML20215M530 + (ML20215M530)
- PY-CEI-NRR-0550, Requests Exemption from 10CFR50,App E,Requiring Full Participation Emergency Preparedness Exercise to Be Conducted within 1 Yr Before Issuance of Full Power OL + (ML20215M531)
- ML20215M532 + (ML20215M532)
- 05000271/LER-1986-014, :on 860708 & 15,standby Liquid Control Solution Concentration Sampling Missed.Caused by Procedural Weaknesses.Shift Supervisor Instructed to Log All Additions to Standby Liquid Control Tank + (ML20215M533)
- ML20215M534 + (ML20215M534)
- ML20215M535 + (ML20215M535)
- ML20215M536 + (ML20215M536)
- ML20215M537 + (ML20215M537)