ML20215M501

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/87-08 on 870323-27.Enforcement Conference Scheduled for 870514 to Discuss Apparent Violation,Per 870508 Telcon
ML20215M501
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/08/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20215M503 List:
References
EA-87-071, EA-87-71, NUDOCS 8705130277
Download: ML20215M501 (2)


See also: IR 05000285/1987008

Text

,

a

Je . J

MAY 8 -- 1987

,

In Reply Refer To:

Docket:- 50-285/87-08

EA: 87-71

>

Omaha Public' Power. District

ATTN:- R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska

68102

Gentlemen:

This. refers to the inspection conducted by L. D. Gilbert of this office during

,the period March 23-27, 1987, of activities authorized by NRC Operating License

DPR-40 for the Fort Calhoun Station, and to the discussion of our findings with

Mr. W. G. Gates and other members of your staff at the conclusion of the

inspection.

The~ area. examined during the inspection was the welding of safety-related

piping and structures. -Within this area, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations' by the NRC inspector. The inspection findings are

. documented in the enclosed inspection report.

During this inspection, it was found that certain of-your activities appear to

be in violation of.NRC requirements. As discussed in our telephone conversation-

on May 8, 1987, with you, we have scheduled an enforcement conference in our

office'at 8:30 a.m. (CDT) on May 14, 1987, to discuss your understanding of the

apparent: violation, the reasons for- the occurrence, and your corrective actions.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

~ Sincerely,

Od;:Inal signed &/

0. E. Gag ;arda

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

- - - - -

--

Appendix - NRC Inspection Report

50-28 /87-08

EC k

C:RPB

W

RIV:RSk/S

C:ES

'

C

B

/cg

Eire

d

DRHunter

.dI

DAPowers JEGagl

o

\\,/LDGilbe

( $ /87

, g/9 p7

(/j /87

f/T/87

5 /g /87

g/p /

$o

t

g53o$$$ EsoSh$5

i

I

G

,

__

- _

Q :;_,

'

,

Omaha'-Public Power District

-2-

m

,

cc w/ enclosure:

W. G. Gates, Manager.

Fort Calhoun Station

P. O. Box-399-

Fort Calhoun, Nebraska

68023

Harry H. Voigt, Esq.

LeBoeuf,. Lamb, Leiby & MacRae

1333 New Hampshire Avenue,LNW

' Washington,-D. C.

20036

Kansas Radiation Control Program Director-

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • RPB
  • RRI

.

R.D.-Martin,_RA

  • R&SPB
  • Section Chief (RPB/B)

~* MIS System

'*RIV File

DRSP

  • RSTS Operator
  • RSB
  • Project Inspector
  • D. Weiss, RM/ALF
  • R. Hall
  • L. Gilbert
  • Section Chief, RSB/ES
  • D. A. Powers, EC
  • w/766.