Forwards Insp Rept 50-271/86-17 on 860909-12 & Notices of Violation & Deviation.Based on Results of Insp,Verification of Full Compliance W/Ie Bulletin 80-11 Re Masonry Wall Design Unfulfilled Due to Lack of Documentation
ML20215M479
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/23/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20215M481 List:
References
IEB-80-11, NUDOCS 8610300278
Download: ML20215M479 (2)


See also: IR 05000271/1986017

Text

.

e

OCT 2 31996

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

Vice President and Manager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection Report No. 50-271/86-17

This refers to the special announced inspection conducted by Mr. A. A. Varela

of this office on September 9-12, 1986 at Yankee Atomic Framingham,

Massachusetts Office and the Vermont Yankee Plant of activities authorized

by NRC License No. DPR-28 and to the discussions of our findings held by Mr.

Varela with Mr. P. Donnelly of your staff at the conclusion of the inspection.

In addition, this refe'rs to the supplemental information provided in your

September 19, 1986 letter regarding your IEB 80-11 reverification activities.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that two of your activities

were not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

These violations

have been categorized by severity level in accordance with the " General State-

ment of Policy and Procedure for NRC Enforcement Action," 10 CFR Part 2,

Appendix C (Enforcement Policy 1986). You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

Another activity appears to be a deviation in that the evaluations performed

regarding mortar strength were based on assumptions and specifications and not

on construction records or tests.

This deviation is described in Appendix B.

You are requested to also respond to the deviation following the instructions

provided in Appendix B.

Based on the results of this inspection, we were not able to verify that you

had fulfilled the commitments made in your responses to IE Bulletin 80-11,

Masonry Wall Design.

The lack of documentation regarding the procedures and

criteria used in the 1980 surveys performed to identify those walls which would

be subjected to detailed analysis and regarding your verification of mortar

strength led us to question the adequacy of your actions. However as a result

of our review of your September 19, 1986 submittal, we understand that, with

the exception of four walls in the Turbine Building, you have concluded that

the reverification program substantiated the adequacy of your original survey

and analyses activities. We will confirm this during future inspections,

l

0FFICIAL RECORD COPY

IR YA 86-17 - 0001.0.0

4'6g

8610300278 861023

I

PDR

ADOCK 05000271

I

O

PM

,

.

Vermont Yankee Nuclear

2

Power Corporation

.

Your cooperation with us in this matter is appreciated.

Sincerely,

Origine.1515ned BYt

JacquoP.Du n

Stewart D. Ebneter, Director

'

Division of Reactor Safety

Enclosures:

,

Appendix A, Notice of Violatio)n and Appendix B, Notice of Deviation

1.

2.

Combined NRC Region I Inspection Report Number

with Appendices A and B

cc w/ encl:

R. W. Capstick, Licensing Engineer

J. Gary Weigand, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

Donald Hunter, Vice President

Cort Richardson, Vermont Public Interest Research Group, Inc.

Gerald Tarrant, Commissioner, Department of Public Service

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

i'

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

M. McBride, RI, Pilgrim

i

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

Robert J. Bores, DRSS

I:DRS

DRS

RI:DRS

arela/rw

Wiggins

Durr

10/ 7,V86

10/bl /86

10/.23 /86

0FFICIAL RECORD COPY

IR YA 86-17 - 0001.2.0

10/21/86

1

-- - - - -

- - . - ,

. . . . - - - - . . _ .

.,. _ . - . - - . . , - - . ,

- , - - - - - - . , - - , , , , , .

- - - -

,-,..~,-n,-..

- - - - --,-- ,--