Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000285/LER-1987-010, :on 870408,discovered Surveillance Tests Not Containing Steps to Verify Stroke Test Requirements of ASME Section Xi,Subsection IWV-3522.b for Valves FW-173 & FW-174. Revs Made to Operating Instructions + (ML20215L886)
- ML20215L887 + (ML20215L887)
- ML20215L888 + (ML20215L888)
- 05000454/LER-1987-012-02, :on 870408,contract Maint Crew Stroked RHR HX Component Cooling Water Outlet Isolation Valve,Causing Surge Tank to Reach Low Level CC Pump Trip.Caused by Communication Breakdown Between Maint Crew & Shift Personnel + (ML20215L889)
- ML20215L890 + (ML20215L890)
- ML20215L891 + (ML20215L891)
- ML20215L892 + (ML20215L892)
- 05000267/LER-1987-010, :on 870402 & 03,reactor Scram Circuitry Actuated Three Times on Wide Range Channels III & V Neutron Flux Rate of Change High.Caused by Susceptibility of Channels to Electrical Noise + (ML20215L894)
- ML20215L896 + (ML20215L896)
- ML20215L897 + (ML20215L897)
- ML20215L898 + (ML20215L898)
- 05000341/LER-1987-012, :on 870410,HPCI & RCIC Declared Inoperable Due to Blown Fuse.Caused by Failed Fixed Capacitor C-25 in Isolation Instrumentation.Hpci & RCIC Restored + (ML20215L903)
- ML20215L904 + (ML20215L904)
- IR 05000400/1987017 + (ML20215L905)
- ML20215L907 + (ML20215L907)
- ML20215L908 + (ML20215L908)
- ML20215L910 + (ML20215L910)
- ML20215L913 + (ML20215L913)
- ML20215L914 + (ML20215L914)
- ML20215L915 + (ML20215L915)
- ML20215L918 + (ML20215L918)
- ML20215L919 + (ML20215L919)
- ML20215L921 + (ML20215L921)
- PNO-III-86-119, on 861020,northwest District of Ohio Assoc of Public School Employees Signed Resolution Opposing Member Participation in Planning or Actual Participation in Evacuation Caused by Nuclear Plant Accident + (ML20215L922)
- ML20215L923 + (ML20215L923)
- ML20215L925 + (ML20215L925)
- ML20215L927 + (ML20215L927)
- ML20215L928 + (ML20215L928)
- ML20215L929 + (ML20215L929)
- IR 05000423/1987009 + (ML20215L930)
- TXX-6052, Interim Deficiency Rept CP-86-46 Re Gould Battery Racks Transverse Bracing.Originally Reported on 860611.Engineering Procedure Revised to Provide More Detailed Instructions. Next Rept Anticipated by 870501 + (ML20215L931)
- ML20215L932 + (ML20215L932)
- ML20215L933 + (ML20215L933)
- ML20215L934 + (ML20215L934)
- ML20215L936 + (ML20215L936)
- NUREG-1166, Forwards Fes on Decommissioning of Facility.Comments on Des & Responses to Comments Incorporated in Fes.W/O Fes + (ML20215L937)
- ST-HL-AE-2156, Informs That Util Will Wrap Solid State Protection Sys (Ssps) Demultiplexer & Time Synchronization Cables to Resolve NRC Concerns During 870504 Meeting That Deviation from Reg Guide 1.75 Unacceptable + (ML20215L938)
- 05000483/LER-1987-003, :on 870402,reactor Protection Sys Actuation Occurred Due to Water Level in Steam Generator Decreasing lo-lo Level Trip Setpoint.Caused by Open Power Supply Breaker.Breaker Replaced & Workers Retrained + (ML20215L941)
- ML20215L942 + (ML20215L942)
- ML20215L944 + (ML20215L944)
- ML20215L945 + (ML20215L945)
- ML20215L948 + (ML20215L948)
- ML20215L951 + (ML20215L951)
- ML20215L952 + (ML20215L952)
- ST-HL-AE-2153, Forwards Excerpt from Amend 6 to Plant Fire Hazard Analysis Rept,Section 2.4.1.2 Re Charging Pump Suction Gravity Pump. Section Changed to Describe Ability of Charging Pumps to Take Suction from Gravity Drain Sys of Boric Acid Tanks + (ML20215L953)
- ML20215L954 + (ML20215L954)
- IA-87-383, Final Response to FOIA Request for List of Lpdrs & Info Re NRC Matls Maintained.Forwards App a Documents.W/O Encls + (ML20215L956)
- ML20215L956 + (ML20215L956)
- TXX-6053, Interim Deficiency Rept CP-86-52 Re Cable Tray Splices/ Connections.Initially Reported on 860725.Testing Program Initiated to Evaluate Conditions.Next Rept Anticipated by 861212 + (ML20215L961)
- ML20215L963 + (ML20215L963)
- ML20215L964 + (ML20215L964)