Georgia Power Company 333 Piedmont Avenue Atlanta, Georgra 30308 Telephone 404 526-6526 i
Marling Address:
Post Office Box 4545 At'anta, Georgia 30302 M
j Georgia Power i
L T. Gucwa lh" We! t*LIRC S Vutem Manager Nuclear Safety "d '* "'" 9 SL-2644 0344m X7GJ17-V750 June 19, 1987 U. S. Nuclear Regulatory Commission j
ATTN:
Document Control Desk Hashington, D.C.
20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 CHANGES IN INITIAL STARTUP TEST PROGRAM i
Gentlemen:
The following information is provided in accordance with Operating License Condition 2.C.(3) whereby Georgia Power Company is to report any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59.
The Flux Map Test, described in FSAR Section 14.2.8.2.30, has been revised to reflect the deletion of this test at the 90 percent power plateau.
This revision is in conformance with the recommendations of Regulatory Guide 1.68, " Initial Test Programs for Water-Cooled Nuclear Power Plants." Enclosed is an abstract of the revised test.
The revision to the test abstract will be incorporated in a future FSAR amendment.
Please contact this office if you have any questions.
Sincerely, I
M&m L. T. Gucwa EMB/im
Enclosure:
1.
Test Abstract Revision c:
(see next page) 8706260208 870619 I
)
PDR ADOCK 05000424 1
P PDR
}
l J
o GeorgiaPower d l
1 U. S. Nuclear Regulatory Commission June 19,1987 Page Two c:
Georaia Power Comp.any 1
Mr. R. E. Conway l
Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.
Mr. J. F. D'Amico Mr. C. H. Hayes j
GO-NORMS 1
. Southern Cotnoany Services l
Mr. R. A. Thomas l
Mr. J. A. Bailey l
Shaw. Pittman Potts & Trowbridge l
Mr. B. W. Churchill, Attorney-at-Law 1
l J_toutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory _ Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle Georgians Against Nuclear Energy Mr. D. Feig Ms. C. Stangler l
0344m mm
i GeorgiaPower d ENCLOSURE PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 CHANGES IN INITIAL STARTUP TEST PROGRAM 14.2.8.2.30 Flux Map Test A.
Objective 1.
To determine the reactor core power distributions for various control rod configurations at 30, 50, 75, and 100 l
percent power.
B.
Prerequisites 1.
Incore instrumentation and process computer are operable.
2.
Reactor is critical, and power level is established as necessary.
C.
Test Method Use data collected from incore detectors to generate a flux map.
D.
Acceptance Criterion The core flux distribution indicated by the flux maos are acceptable and in accordance with plant Technical Specifications.
0344m E-1 06/19/87 SL-2644 mns l