Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215J966 + (ML20215J966)
- ML20215J967 + (ML20215J967)
- ML20215J968 + (ML20215J968)
- ML20215J970 + (ML20215J970)
- IR 05000483/1987014 + (ML20215J971)
- 05000440/LER-1987-034, :on 870521,RCIC Isolation Occurred.Cause Related to Use of Ohmmeter to Monitor Status of Initiating Relay Contacts in Surveillance Test Instruction.Plant Administrative Procedure PAP-0205 Revised + (ML20215J972)
- 05000373/LER-1986-038, :on 860921,reactor Mode Switch over-rotated to Run Position,Resulting in Scram Signal & Main Steam Line Isolation.Caused by Personnel Error.Switch Returned to Startup Position.Personnel Briefed + (ML20215J973)
- ML20215J975 + (ML20215J975)
- ML20215J980 + (ML20215J980)
- ML20215J983 + (ML20215J983)
- ML20215J984 + (ML20215J984)
- ML20215J985 + (ML20215J985)
- ML20215J986 + (ML20215J986)
- IR 05000413/1987011 + (ML20215J987)
- ML20215J988 + (ML20215J988)
- 05000440/LER-1987-036, :on 870525,rod Pattern Controller Surveillance Missed During Reactor Startup in Violation of Tech Spec. Caused by Personnel Error.Operator Counseled on Need for Attention to Detail + (ML20215J989)
- ML20215J991 + (ML20215J991)
- ML20215J993 + (ML20215J993)
- ML20215J995 + (ML20215J995)
- ML20215J996 + (ML20215J996)
- NUREG-1100, Forwards NRC Functional Organization Chart (NUREG-0325), Reflecting New Organizational Structure & Addendum to NRC Budget Estimates for FY88-89 (NUREG-1100,Vol 3),recasting Estimates Submitted in Jan 1987.W/o Encls + (ML20215J997)
- ML20215J999 + (ML20215J999)
- ML20215K000 + (ML20215K000)
- ML20215K003 + (ML20215K003)
- ML20215K004 + (ML20215K004)
- ML20215K005 + (ML20215K005)
- ML20215K007 + (ML20215K007)
- ML20215K008 + (ML20215K008)
- ML20215K009 + (ML20215K009)
- ML20215K012 + (ML20215K012)
- 05000440/LER-1987-018, :on 870316,RCIC Sys Isolation Occurred.Cause Related to Use of Ohmmeter to Monitor Status of Initiating Relay Contacts in Surveillance Test Instruction.Plant Administrative Procedure PAP-0205 Revised + (ML20215K013)
- NLS8700223, Forwards Addl Info Re Proposed Change 1 to Facility Safeguards Plan.Info Withheld (Ref 10CFR73.21) + (ML20215K014)
- ML20215K015 + (ML20215K015)
- ML20215K016 + (ML20215K016)
- ML20215K017 + (ML20215K017)
- ML20215K018 + (ML20215K018)
- ML20215K020 + (ML20215K020)
- IR 05000482/1986007 + (ML20215K021)
- ML20215K022 + (ML20215K022)
- AECM-86-0256, Provides List of Actions & Responses to IE Bulletin 83-03 Re Check Valve Failures in Raw Water Cooling Sys Due to Number of Responses Not Corresponding W/Required Action Numbers,Per NRC + (ML20215K023)
- ML20215K024 + (ML20215K024)
- ML20215K026 + (ML20215K026)
- IR 05000498/1987003 + (ML20215K028)
- L-86-351, Forwards Changes,Tests & Experiments Made W/O Prior Commission Approval for Period Jul 1985 - June 1986 + (ML20215K029)
- ML20215K031 + (ML20215K031)
- ML20215K032 + (ML20215K032)
- ML20215K034 + (ML20215K034)
- ML20215K035 + (ML20215K035)
- ML20215K038 + (ML20215K038)
- ML20215K039 + (ML20215K039)
- ML20215K042 + (ML20215K042)