Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215C017 + (ML20215C017)
- ML20215C019 + (ML20215C019)
- IR 05000424/1986115 + (ML20215C020)
- ML20215C021 + (ML20215C021)
- ML20215C022 + (ML20215C022)
- TXX-6497, Interim Deficiency Rept CP-86-73 Re Installation of ASME Snubber Attachment Brackets.Initially Reported on 870320. Results of Evaluation of 165 Supports Listed.Project Procedures Under Evaluation.Next Rept by 870918 + (ML20215C023)
- ML20215C025 + (ML20215C025)
- ST-HL-AE-2242, Final Deficiency Rept Re Electrical Splices Using Raychem Heat Shrink Insulation Matl.Craft,Field Engineers & Field QC Personnel Reinstructed on Use of Raychem Matl & Site Std Procedure 26, Termination of Electrical Cables, Revised + (ML20215C026)
- ML20215C027 + (ML20215C027)
- ML20215C031 + (ML20215C031)
- ML20215C032 + (ML20215C032)
- ML20215C033 + (ML20215C033)
- IR 05000280/1986039 + (ML20215C035)
- ML20215C037 + (ML20215C037)
- ML20215C038 + (ML20215C038)
- ML20215C039 + (ML20215C039)
- ML20215C040 + (ML20215C040)
- IR 05000413/1986039 + (ML20215C041)
- ST-HL-AE-1767, Comparison of Treat & Notrump Small Break LOCA Transient Results + (ML20215C043)
- ML20215C045 + (ML20215C045)
- ML20215C047 + (ML20215C047)
- ML20215C048 + (ML20215C048)
- ML20215C049 + (ML20215C049)
- ML20215C050 + (ML20215C050)
- ML20215C051 + (ML20215C051)
- ML20215C052 + (ML20215C052)
- ML20215C054 + (ML20215C054)
- ML20215C056 + (ML20215C056)
- ML20215C060 + (ML20215C060)
- NRC-87-0064, Revised Pages to Annual Operating Rept for 1986 + (ML20215C062)
- BSEP-86-1187, Forwards Monthly Operating Repts for Jul 1986 & Corrected Monthly Operating Rept for June 1986 for Unit 2 + (ML20215C063)
- ML20215C065 + (ML20215C065)
- ST-HL-AE-2237, Provides Addl Info Re FSAR Changes Transmitted by Util ,Describing Containment Isolation,Component Cooling Water Supply/Return to Reactor Coolant Pumps,Reactor Coolant Drain Tank HX & Excess Letdown HX + (ML20215C067)
- IR 05000424/1986061 + (ML20215C069)
- IR 05000369/1986021 + (ML20215C070)
- ML20215C073 + (ML20215C073)
- ML20215C074 + (ML20215C074)
- ML20215C076 + (ML20215C076)
- U-600778, Final Deficiency Rept 55-86-08 Re Improper Installation of Raychem Insulation on Splices in Class 1E Circuits.Initially Reported on 860902.Defective Splices Reworked & Repaired + (ML20215C077)
- ML20215C078 + (ML20215C078)
- ML20215C079 + (ML20215C079)
- ML20215C080 + (ML20215C080)
- ML20215C081 + (ML20215C081)
- ML20215C082 + (ML20215C082)
- ML20215C087 + (ML20215C087)
- ML20215C088 + (ML20215C088)
- ML20215C090 + (ML20215C090)
- ML20215C091 + (ML20215C091)
- ST-HL-AE-2246, Forwards Annotated Revs to FSAR Section 7.7.1.9.2 to Reflect Design Changes to Reduce Bmi Thimble Vibration & Wear,Per Confirmatory Item 45.Revs Will Be Included in Future FSAR Amend + (ML20215C093)
- ML20215C095 + (ML20215C095)
- ML20215C098 + (ML20215C098)