- CP$!, CO PLANI H.RiTR ENCE D A T A 5 Y b T fDi Pt.GE i
CrJ/05/06 Af9ENDIX D AVFRAGE DALLY i'La;E R LEVEL RFD37 Rbt[DtrJE RIIH T IliE 13:35:40 raiUNSW l CK UNIT i DOCl:E r no, c50 0325 COMPLEIlD BY iHANCEa m omI 3dN I s.L" 'hl1NF (919)457-9521 JULY
- 706 DAY AVC. LMLf POL'ER LEVEI DAY AVL DAli Y I'OUER LEL; (MUE-NET)
( M W E - N E'i )
1 767 17
/39
?
/.-
ii 7S0 a
764
- 7 64t 4
766 2C 7.'.
v e
a e % A) 4
/
d
.I a
ic.
('
7
~763 23 75?
0 756
'J 4 7'59 i
761
?
lo3 10 76G 26
'74 s 11 ini 27 756 i
'I / V
- a. O
"[ #$ (Lt A ?
a r1 r,
I &
13 762 29
<>/4
~
14
/ai 20 75A 7
15 761 31
/55
?61 i.i.
8610100070 860807 PDR ADOCK 05000324 R
i r
DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: August 1986 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 Brunswick Unit 1 operated at 100 percent availability factor for the month of July with a 94.91 percent capacity factor. There were three power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel
- pool, i
i
UNIT SHUTDOWNS AND I. WER REDUCTIONS DOCKET NO.
050-0325 UNIT NAME -Brunswick i DATE August 1986 REPORT MONTil July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-952i W
.$ E 3
E e
$ 5 5' Licensee
,Eg je.
Cause & Corrective 6
No.
Date g
3g 4
,3 y 5 Event g7 a.3 Action to 3'5 Repor #
t.o O
$O Prevent Recurrence H
5 i,
o e
C I,
86037 860718 S
.00 B
5 N/A Reduced power for rod improvement, scram time testing on varie.us rods and steam leak repair i
i 1
1 2
3 l
F: Forced Reason:
Method:
C Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual r"-i of Dais B-Maintenance of Test 2-Manual Scram.
C' Licensee C Refueling 3 Automatic Scram.
.2) File (NUREG-D-Regulatory Restriction 4 Contitiustions E-Operator Training & License Examination 5-Load Reductions F-Administrative 6-Other t
G Operational Errar (Explain)
... eit I-Same Source 19/77) llother (Explain) 1
b UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick 1 DATE August 1986 REPORT MONTH July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-952I 3
.! E 3
. 5k Licensee
,E3, h".,
Cause & Corrective 8-Action to No.
Date g
3g
(
,3 g 5 Event
- ?
$'3
$E 5
3i ifi Report #
N0 Prevent Recurrence
.c u
d 86038 860720 F
.00 A
5 N/A Reduced power to reduce turbine bearing vibration while removing secondstage reheat from service.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Liernsee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuatione 0161)
E-Operator Training & License Examination 5-Load Reductions F-Administrative 6-Other 5
GOperational Error (Explain)
Exhibit 1 Same Source 19/77)
Il-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick i DATE August 1986 REPORT MONTH July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-952I "i
f*3
.! E 3
5 ('
Licensee Eg Cause & Corrective No.
Date g
3 ij j
,gy5 Event u7 o-Action to H
$~
E ji5-Report #
nu
!O Prevcat Recurrence
.e u
6 86-040 860728 F
00 A
5 N/A Reduced power while removing heater drain pump IA from service due to problem with discharge check valve.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Preparation of Data B.Maintenar:e of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 4 Continuations 0161)
E-Operator Training & License Examination 5-Load Reductions F Administrative 6-Other 5
G-Operational Error (Ei: plain)
Exhibit I - Same Source 19/77)
Il-Other (Explain)
(.-.-_..
. _ -. ~. -.. -
CPhL CO,
PLANT PERFORMANCE DATA SYSTEM PAGE 2
i., RinJ D/.TE 00/05/86 APPENDIX D - AVERAGE DAILY. POWER LEVEL RPD37 RUN TIME 13:33:40 BRUN0 WICK UNIT 2 i
t i
1 1
i DOCKET NO. 050-0324 e
j COMPLETED BY FRANCES HARRIS 0t4 j
l TELEPHONE (919)457-9521 i
- , JULY 1906 e
DAY AVG. DAILY POWER LEVEL DAY AVG DAILY POWER LEVEL (MUE-NET 1
( MWE-- NET )
1 750 17 752
[
t t
2 764 10 7:59 I
-3 759 19
?i?
i 4
744 20 749 4
i f
5 687 21 752 i
I 6
764 22
'72S
}
7 763 23 701 i
8 750 a'
698 i
t 9
-665 25
/::4 l' 0 609 26 731 i
11
- i 1 2 ~/
752 f
12
-13 20 754 13
-15 29 756 i
i4 50 30 751 L
15 561 Ji 749 i
16 6 '! ?
l t
i.16 8
t L
k
_._m.__
._.___-.m.
CF'6L CO.
PLANT PERFORMANCE DATA SYSTEM PAGE 2
- , RJ!N._D ATE 08/05/86 DPERATING DATA REPORT RPD36 RUN' TIME 13
- 33.42 BRUNSWICK UNIT 2 I
DCCKET NO. 050-0324 COMPLETED BY FRANCES HARR1 SON OPEf! A i ING ST ATUS TELEPHONE (919)457 952i 1.
UNIT.NAME-BRUNSWICK UNIT 2
! NOTES i
j 2 ' REPORTING PERIOD: JU' Y 86 l
i j
j
- 3. LICENSED THERMAL POWER (MWT) 2436 l
i 4.
NAMEPLATE RATING (GROSS MWE): 067.0 1-l S.
DESIGN ELECTRICAL RATI9G (NET MWE)
G21.0 i
i I
6.
MAX DEPENDADLE CAPACITY (MtOSS MWE) 815.0 i I
- 7. MAX DLPENIABLE CAPACITY (NET l1WE) 790.0 8.
IF CHANGES OCCUR IN CAPACITY RolINGS ( 11 E tiG 3 1HRU 7) SINCE LACl REPORT, l
1 l
GIVE REASONG:
I I
i l
M.
POWER L.EVEL TO WHICH RE0lRICTED IF ANY (Nn MWE):
- 10. REAGONS FOR RESTRIClIGN IF AN't 3
6 t
i THIG (R TO CUMUL I
h0 NTH DATE ATIVE i
l i
-11.
HOURS It4 REPORTING PERIOD 744.00 5037.00 94176.00 l
1
- 12. NUMLER OF HOURG REACTOR CR111CAu 667.43 956.30 55460.66
- 13. REACTOR RESEf;VE CHU FDOWN-HR3
.00
.CO
.00 j
- 14. HOURS GENERATOR ON LINE 652.20 L21.59 51832.68
- 15. UNIT DESERVE GNUTDOWN HOURS
.00
.00
.00
- 16. GROCS THERMAL ENERGY GEN. (MWH) 1512107.05
/67167.94 100."97040.47
~
ENERGY GEN. (MWH) 486417.00 561727,00-33357211.00
- 17. GROSS ELEC.
- 10. NET ELEC. ENERGY GENERATED (MWH) 460352.00 51043?.00 31748430.00 UtM T GERVICE FACTOR 87.66 1 6.1 '_;
S5.04 f
19.
- 20. UtJIT AVAILABILITY r AC f 0R 87.66
'16.15 55.0-1
' 21. L; NIT CAP. FACTOR (UDING MDC NET:
79.63 12.70 42.94 2?. UNIl CAP FACTOR.(USING DER NET) 76.60 12.??
41.3?
i
- 23. UNII FORCED CUTAGE RATE
.00 19.44 15.54 i
- 24. CHUIDOWN:., SCHED. OVER NEXT 6 MON 1HS (1YPE, DATE, AND DURA 110N OF EACH, l
l
- 25. IF GNU 1DOWN AT END OF REPO?T PERTOD, ESTIMATED DATE OF START Ur-
- 26. UNIls IN TEST STATUS (PRIOR TO COMtir (C [ AL Of'ER A 10N)
FORCMT ACHEIVED i
i INITIAL CRIIICALI1Y
'~- -
l l
i IN111.AL ELECTRIC [TY l'
i i
ColiMERCIAL GPERATION i
4 6
l.
l t
j,i- - p l-
}
l*
l DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: August 1986 COMPLETED BY: Frances Harrison 4
t OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 4
)
Brunswick Unit 2 operated at a 79.68 percent ~ capacity factor and an 87.66 percent availability factor. There was one off-line outage and two power reductions.
Details are in the Unit Shutdowns and Power Reductions sheet.
There are 856 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel f
pool.
F 1
4 i
i l
i l
O h
O DOCKET NO. 050-0325 UNIT SHUTDOWNS AND.- )WER REDUCTIONS Brunswick II _
UNIT NAME DATE August 1986~ ~
REPORT MONTH July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 A
n.
1 E
c
.$ g
'h j.L' y Licensee Eg jet Cause & Corrective '
]
No.
Date h
3g 2'5 Event g
pU s
Action to
$E j (f3 Repori #
mO Prevent Recurrence H
g t
C i
86-012 860710 S
91.80 B
1 N/A Planned of f-line outage to repair reactor water cleanup valve G31-F001.
I
)
i l
l l
l l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Liecusee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & Ucense Examination 5-Load' Reductions F-Administrative 6-Other 5
G-Operational Error (Explain)
Exhibit 1 Same Source (9/77)
Il-Other (Explain)
UNITSHUTDOWNS AND )WER REDUC 110NS DOCKET NO. 050-0325 UNIT NAME Brunswick 2 DATE August 1986 REPORT MONTy July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 M,
r Licensee
,Ev, Cause & Corrective *
.$ E 3
h 5 ('
No.
Date g
gg g
jg5 Event u?
E3 Action to i
H
$E jd Repor #
$0
[U Prevent Recurrence 6
86-016 860718 F
.00 A
5 N/A Reduced power due to recirc pump B runback.
i p
1 2
3 4
i F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data l
B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4: Continuations 0161)
E-Operator Training & Ucense Examination 5-Load Reductions s
F Administrative 6-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source 19/77)
Il-Other (Explain)
'~
050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Brunswick 2 DATE August 1986 REPORT MONTH July 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-952l i
l
.$ E 3
5 Licensee
,Eg f%
Cause & Corrective No.
Date g
3 Ej g
,g y 5 Event g7 o3 Action to
~5i Report #
mu yu Prevent Recurrence H
g3 2.,
5 i
O e
6 86-017 860732 F
.00 A
5 Reduced power to resolve TIP I
problem (TIP locations switched) h i
l l
2 3
4 i
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensec C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuations 0161) i E-Operator Training & License Examination 5-Load Reductions F-Administrative 6-Other 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
II-Other (Explain)
_..._.____._.-.m__.._..
.CP[l CG PLANT PERFORMANCE DATA SYSTEM PAGE F.~RUN DATE' 08/05/86 OPERATING DATA REPORT
.RPD36 l
--ft U N r T I M E ' -13:35:42 DRUNSWICK UNIT 1
[
DOCKET NO- 050-0325 i
COMPLETED DY FRANCES HARRISON I
OPERATING STATUS TELEPHONE (919)457-9521 1
i
[
~ 1.
UNIT NAME: BRUNSWICK UNIT 1
! NOTES l
[
2.
REPOR(ING PERIOD. JULY 06 i
- 3. LICENSED THERMAL POWER (MWT)' 2436 I
i j
4.
NAilEPLATE RATIN5 (GROSS MWE) 867.0' l
.i
- 5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 l
- 6. MAX DEFENDADLE CAPACliY (GROSS r1WE) 815.0.I I
l 7.! MAX DEPENDADLE CAPACITY _(NET MWE). 790.0 01 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPC'lT,
GIVE REASONS:
i i
h
[
i
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET tiWE )
- 10. REASONS FOR RES1RICTION IF ANY:
I i-THIS YR TO CutiUL
~
MONTH DATE ATIVE l
r l
- 11. HOURS IN REPORTING PERIOD 744.00 5087.00 32152.00 f
1
- 12. NUMBER OF HOURS REAC1CR CRITICAL 744.00 4900.62 51732.10 I
-13.
RE' ACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10 i4. HOURS GENERATOR ON LINE 744.00 4706.00 48924.10 l
l
- 15. UNIT RESERVE.SHUiDOWN HOURS
.00
.00
.00
- 16. GROSS THERtiAL ENERGY GEN. (MWH) 178??64.8i 11353936.81-101460600.46 i
- 17. GROSS ELEC. ENEPGY GEN. (MWH) 575235.0C 3723164.00 33474437.00
- 18. NET ELEC. ENERGY GENERATED ( ti W H )
~.i7810. 00 3612243.00 32170940.00 r
! - 19. UNIT SERVICE FACTOR 100.00 94.10 39.55 l
l
- 20. ' UNIT AVAIL ADILI1Y FACTOR 100.00 94.10 59.55 l
2i. UNIT CAP. FACTOR'(USING MDC NET) 94.9i 89.09 49.57 l-
- 22. UNIT CAP. FACTOR (USING DER NET) 91.32 86.49 47.70 l-23.' UNIT FORCED OUTAGE TATE
.00 5.90 i8.80
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATC. AND DURATION OF EACH)_
j
' 25. IF SHUTDOWN AT END CF REPORT PER[0D, ESTlMAiED DATE OF START UP j-2 6 ~. UNITS IN TEST STATUD (PRIOR TO COMME.RCIAL QPERATION)
FORCAST ACHEIVED 1
i i
INITIAL CRITICALITY
-- -~-
r INII'I AL ELECTRICITY t
C0hMERCIA CPERATION L
i I
,o i-r i
o