ML20215C073
| ML20215C073 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 12/08/1986 |
| From: | Nelson G, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19292G440 | List: |
| References | |
| 70-1257-86-09, 70-1257-86-9, NUDOCS 8612150016 | |
| Download: ML20215C073 (1) | |
Text
C'.' m::l p,['-~,
3 r -
3] ;3 3
~
e
~'w s -
(l t
.:BTERIA!. IlWiSMITTED HEREWI11f f75TAE,
.gi nQ[ " "'-
lf S;.;:.
.- n. s.
3 y
1,- ;w y.<
I%a n
c l..
' - J s
,m ThetinformationLon this'page isTeonsidered to'.be~
appropriateifor. public, disclosure. pursuan't. to -i -
.yl, -
~
n
]
- 10.CFR 2.790, d
i a
v
.e SU. S. NUCLEAR REGUIATORY'COMMISSIONi. _ '
' REGION.Y
~
'~
n
+
g d
h
[ Report No.[70-1257/86-09 (IE-V-779)
~.
V f4
- y. ! Docket No.170-1257 a1 License No.? SNM -1227 ' -
. Safeguards' Group: III:
.y.
Exxon! uclear. Company,IInc.
[
N
' Licensee:
F e
' 21011 Horn Rapids. Road. :
Richland, Washington-99352 Facilitiy Name:. Exxon Nuclear Fuel: Fabrication Facilit'y
~
3
+
,. M ; Inspection at:,Norn Rapids Road Facility, Richland, Washington
~
Inspedtion' Conducted:. November 17 21, 1986l '
6 1
' July >31.-
-Dates of Last Material. Control:and Accounting; Inspection September 5, 1986'
. Type nf Inspection: Routine and Reactive Unannounced Material Control and
~
Accounting g
~~8 ~
Inspector:
ph G. B.-Nelson, Chemist Date Signed Approved by:
/)'?7 O lu I
M. D. Schuster, Chiet Date Signed Safeguards Section Summary:
Inspection on November 17-21, 1986 (70-1257/86-09).
~
Areas Inspected: Followuponinspectoridentifie[1problemsandunresolved
- items, followup on violations, facility operations and internal controls, measurement systems, and MC&A for imports and exports. During the inspection, Inspection Procedures 92701, 92702, 85203, 85207, and 85301 were covered.
'Results: Within the areas inspected, no violations or deviations were identified.
UATERIAl. TRANSMITTED HEREWITil CONTAIR$
2.190 thfDIQWH4 8612150016 861209 U
PDR ADOCK 07001257 4
PDR C
a
'