. _
- s,
DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 8/6/86 COMP N e n_
vvAng TELEPHGfE 314/676-8742 PART A OPERATIONS
SUMMARY
Unit operated at 100% power with the following exceptions:
- 1) 7/25/86 - forced power reduction due to turbine runback on loss of circulating water.
- 2) 7/26/86 - turbine trip / reactor trip during turbine surveillance testing.
Plant annual RERP drill conducted with satisfactory results reported from the NRC and FEMA.
PART B PORV AND SAFETY VALVE
SUMMARY
l None 8610100084 860731 PDR ADOCK 05000483 R
PDR CA-#804 04/10/85 QDP-ZZ-04204 Page 1 of 4
[ l
__.7...
.7......
-..-7--.
i
....-._..-..2__._.-.
- s Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE 8/6/86 S. R. EVANS COMPLETED BY TELEPHONE 314/676-8742 MONTH JULY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MW@t)
(MWe Net) 1087 i
1042.3 gy 1098.3 1089.5 2
1, 1105.6 1085.2 3
1094 1090.3 1071 1099.6 5
i 1092 1097.6 6
1091.8 7
1094.3 23 1090.4 1088.3 g
3 1089.6 1001.7 g
g 1090.1 12.2 to 1096.8 0
33 1102.2 485 12 3
1096.2 751.6 13 3
1086.5 767.4 14 15 1072.1 1003.5 y
1087.6 to Page 2 of 4 CA-#804 04/10/85 QDP-ZZ-04204
o g
4 Parc D
~ OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT 8/6/86 DATE S. R. EVANS COMPLETED 8Y 314/676-8742 TELEPHONE OPERATING STATUS
( YTD CUM )
July 1986 GROSS HOURS IN REPORTING PERICO:
744 (5087 14,149.5)
- 1. REPORTING PERIOD:
3411 max. DEPEND. CAPACITY (MWo Neth 1120
- 2. CURRENTLY AUTHORIZED POWER LEVEL t
- At stretch power level which is not currently 1
I" DESIGN ELECTMicAL RATING (MWe Neo:
authorized under the 0 eratin 100%
- 2. POWEa LEVEL To WHicH RESTRicTEDfir ANY) tbLicense.
n
- 4. REASONS FOR RESTRICTION (IP ANYh TH 1 MONTH YR TO DATE CUMULATIVE 718.6 3681.3 12,144.8
- 5. NUMSER OF HOURS REACTOR WAS CRmCAL 0
0 0
- s. REACTOR RESERVE SHUTDOWN HOURS..
697.9 3510.4 11.697.7
- 7. HOURS GENERATOR ON UNE...
0 0
0
- 8. UNIT RESERVE SHUTDOWN HOUR $.,,,.
,,,,,2,,279,207 10,964,142 36,981,695
- 9. GROSS THERMAL ENERGY oENERATED (MWHI
....761,723 3,679,861 12,493,804
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWHI........
723,828 3,490,183 11,858,970 f
- 11. NET ELECTRICAL ENERGY GENERATED (MWHI l
96.6%
72.4% _
85,8'l l
- 12. REACTOR service PAcTOR.........
96.6%
72.4%,
85.8%'
i
- 13. reactor Ava:LAsiLITY PAcTOR._.......
...........,,,, 93.8%
69.0%
82.7%
- 14. uNsT service FACTOR..............
93.8%
69.0%
8 2. 7 */
- 15. UNIT AVAILAesuTY PAcTOR..................,,,,,,,
86.9%
61.3%
,74.8%
ts. unit CAPACITY PacTOR tuewie MDc 58.6%
71.6%
TY P ACTom tueine Demon MWw....,..,,,,..,,
83.1%
- 17. uNiTcAPAc 6.2%
10.2%
7, 4 *z
- 19. UNIT PORCED OUTAGE RATE..,,,....,,,,,,,,,,,,,,
- 19. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS ITYPE. DATE. AND DURATION OF EACHH None
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
t 1
CA-#804 Page 3 of 4 04/10/85 QDP-ZZ-04204
I1
- j l
i Part E DOCKET NO.
50-483 4
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway i
j l
I) ATE 8/6/86 i
I COMPLETED BY S. R. EVANS
?
REPORTMOlnis JULY 1986 TELEPilONE 314/676-8742 i
e METHOO OF TYPE SHUTTING DOUNG F: FORCED OURATION THE REACTOR OR e
NO.
DATE S: SCHEDULED IHOURS)
REASON REOUCING FOWER CORRECTIVE ACTIONS / COMMENTS 15.
7/25/8
)
F 0
A 4
Reduction in power due to turbine i
runback on loss of circulating water.
i 16.
7/26/8 i F
46.1 A
3 Turbine trip / reactor trip during turbine surveillance testing.
i LER 86-027-00 l
I r
enanananay:
REASON BETHOD A: EQUtttIENT FAILURE (EEFLA80R I: BdANUAL R: be480tT.ORTEST 3: bdA000AL 902A00 joo C REFUEUedG 3: AUTOne4TICSCRAlf D: REGULATORY.RESTRaCreces 4: oftmAcasFLAssR s e e.
E: OPERATOR TRAledeteG AND yR$
LICENSE EXAteINAT90N 4
I Co #-
F: ADOS 0lISTRATivE O"
C: OPERATIONAL ERROR (EEFLA8N)
II OflIER(EEFLAlpel
,r s-Page 4 of 4
Umou Etscraic a
Ca#away Plant August 8, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1354
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY 1986 The enclosed Monthly Operating Report for July 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
G. L. Randol h Manager, Callaway Plant Y
/)($ h 6(9 }{fL.
FET/RDA/JED/SRE/drs Enclosure cc: Distribution attached
>d l \\
Mailwy Aadress: P.O Box 620, Fulton, MO 65251
' o o
cc distribution for ULNRC-1354 with enclosures Mr. W. F. Forney, Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 i
i l
l
.