Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B757 + (ML20215B757)
- ML20215B758 + (ML20215B758)
- ML20215B759 + (ML20215B759)
- ML20215B762 + (ML20215B762)
- ML20215B763 + (ML20215B763)
- U-600950, Informs That Util Has Agreed to Revise Procedure CPS 3319.01, Standby Gas Treatment, Per Sser 8,Section 6.2.5 Re Discussion of Reg Guide 1.7 Compliance + (ML20215B766)
- ML20215B768 + (ML20215B768)
- ML20215B769 + (ML20215B769)
- ML20215B770 + (ML20215B770)
- ML20215B772 + (ML20215B772)
- ML20215B773 + (ML20215B773)
- ML20215B778 + (ML20215B778)
- ML20215B780 + (ML20215B780)
- ML20215B784 + (ML20215B784)
- ML20215B786 + (ML20215B786)
- 05000366/LER-1986-034-01, :on 861105,emergency Diesel Generator 2C Started & Tied to Bus.Caused by Personnel Not Adequately Reviewing Logic Prints Before Removing Transformer Compartments from Bus 2G.Sys Restored + (ML20215B787)
- ML20215B789 + (ML20215B789)
- ML20215B790 + (ML20215B790)
- IR 05000327/1987014 + (ML20215B795)
- ML20215B796 + (ML20215B796)
- ML20215B798 + (ML20215B798)
- ML20215B799 + (ML20215B799)
- ML20215B800 + (ML20215B800)
- ML20215B801 + (ML20215B801)
- ML20215B802 + (ML20215B802)
- ML20215B804 + (ML20215B804)
- ML20215B805 + (ML20215B805)
- ML20215B806 + (ML20215B806)
- ML20215B807 + (ML20215B807)
- ML20215B808 + (ML20215B808)
- 05000344/LER-1987-011, :on 870501,excessive Leakage Detected from Penetration E-107 During Check of Penetrations E-112 & E-115.Caused by Leakage Past Electrical Penetration Conductor Seals & Seal Displacement Due to Age + (ML20215B809)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps + (ML20215B810)
- NRC-87-3229, Informs of Completion of Preliminary Design & Engineering of Advanced Pwr.Westinghouse Currently Working on Final Design & Engineering Efforts & Encouraged That Issuance of Preliminary Design Approval Will Be Achieved in Early 1988 + (ML20215B813)
- ML20215B814 + (ML20215B814)
- IA-86-454, Submits Update of 860408 Schedule for Remaining Work Needed on Sser 13 for Comanche Peak Program Plan.Related Info Encl + (ML20215B816)
- ML20215B816 + (ML20215B816)
- 05000278/LER-1986-024-01, :on 861108,partial Group V Primary Containment Isolation Occurred During Testing of RCIC Sys Steam Tunnel Temp Switch.Caused by Loose Wire Connection.Wire Tightened + (ML20215B818)
- ML20215B819 + (ML20215B819)
- ML20215B820 + (ML20215B820)
- ML20215B821 + (ML20215B821)
- ST-HL-AE-2206, Forwards Annotated Revs to FSAR App 3.6.A, Isolation Valve Cubicle Subcompartment Analysis. Rev Due to Calculation Results Showing That Some High Energy Line Break Effects Worse than Main Steam Line Break.Rev Will Be in FSAR Amend + (ML20215B824)
- ML20215B827 + (ML20215B827)
- ML20215B828 + (ML20215B828)
- IA-87-292, Purchase Order DR87-0759 & Printed Notices of Intention to Lease Option to Purchase ADP Equipment + (ML20215B830)
- ML20215B830 + (ML20215B830)
- ML20215B831 + (ML20215B831)
- IR 05000254/1986017 + (ML20215B833)
- 05000322/LER-1987-015, :on 870515,unplanned Initiation of Control Room Air Conditioning B Train Occurred Due to Low Reactor Bldg Differential Pressure.Caused by Failed Interlock Switch. Switch Indicating Door Position Repaired + (ML20215B834)
- ML20215B835 + (ML20215B835)
- ML20215B842 + (ML20215B842)
- 05000528/LER-1986-055, :on 861106,Surveillance Test 36ST-9SA02 Identified as Incomplete,Per Tech Spec 4.0.2.Caused by Inability to Position Control Room Intake Damper Due to Actuator Malfunction.Actuator Adjusted + (ML20215B843)