Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1186-15, Forwards Response to Violations Noted in Insp Rept 50-302/86-27.Corrective Actions:Independent two-party Verification Performed for Procedure SP-341.Procedure CP-115, In-Plant Switching & Tagging, Will Be Revised + (ML20214K924)
- ML20214K925 + (ML20214K925)
- ML20214K926 + (ML20214K926)
- NRC-87-0074, Forwards Addl Info Re Facility Conformance W/Provisions of TMI Action Plan Item II.K.3.28, Verify Qualification of Accumulators on Automatic Depressurization Sys Valves, Per NRC 861205 Request + (ML20214K927)
- PY-CEI-NRR-0650, Responds to Violations Noted in Insp Rept 50-440/87-04 on 870304-0413.Corrective Actions:Diesel Generator Control Air Solenoid Valves in Svc for Over 6 Months Replaced & Failed Valves Returned to Vendor + (ML20214K930)
- U-600947, Notification of Unusual Event:On 870524,motor-driven Feed Pump Regulating Valve 1FW-F004 Malfunctioned,Increasing Reactor Water Level.Cause Under Investigation.Valve Shifted to Manual Control W/No Response.Event Terminated Same Day + (ML20214K931)
- ML20214K933 + (ML20214K933)
- U-600937, Informs That Final Analysis of Equipment Re Survivability in Event of Hydrogen Generation & Combustion Following Degraded Core Accident Will Not Be Submitted Until 871030.Problems W/ Testing Program Due to Mechanical Problems Caused Delay + (ML20214K936)
- ML20214K939 + (ML20214K939)
- NRC-87-0043, Forwards Proposed License Condition 2.C(10), Emergency Diesel Generator Lube Oil Surveillance Program, Per NRC 870407 SER & Util 870128 Application for Amend to License NPF-43 + (ML20214K942)
- ML20214K943 + (ML20214K943)
- ML20214K944 + (ML20214K944)
- ML20214K946 + (ML20214K946)
- ML20214K949 + (ML20214K949)
- ML20214K951 + (ML20214K951)
- ML20214K953 + (ML20214K953)
- ML20214K954 + (ML20214K954)
- ML20214K955 + (ML20214K955)
- ML20214K961 + (ML20214K961)
- ML20214K963 + (ML20214K963)
- ML20214K965 + (ML20214K965)
- IR 05000277/1986021 + (ML20214K968)
- ML20214K971 + (ML20214K971)
- ML20214K972 + (ML20214K972)
- IR 05000312/1986029 + (ML20214K973)
- ML20214K975 + (ML20214K975)
- JPN-87-028, Responds to NRC Re Violations Noted in Insp Rept 50-333/87-07.Corrective Actions:Prejob Briefing & Preshift Briefing Added to Radiological Sensitive Procedures & Procedures Revised to Delineate Responsibilities + (ML20214K977)
- ML20214K979 + (ML20214K979)
- L-86-472, Forwards Florida Power & Light Co,Turkey Point Plant Unit 4,Cycle XI Startup Rept, Per Tech Spec 6.9.1.a.Rept Documents First Time Use of Hafnium Vessel Flux Depression Assemblies & Effects on Core Physics + (ML20214K980)
- ML20214K982 + (ML20214K982)
- ML20214K985 + (ML20214K985)
- ML20214K986 + (ML20214K986)
- 2CAN118608, Forwards Response to Requests for Info in Generic Ltr 86-06 Re plant-specific Concerns Not Covered in Previous Submittals.Parameters Used to Determine Need for Reactor Coolant Trip Include Subcooling Margin & RCS Pressure + (ML20214K989)
- IA-86-577, Partial Response to FOIA Request for Documents Re Nrc/State of Az Agreement Authorizing State to Regulate Disposal of Radwaste Matls within State.Forwards App a Document. Documents Also Available in PDR + (ML20214K992)
- ML20214K992 + (ML20214K992)
- ML20214K993 + (ML20214K993)
- ML20214K994 + (ML20214K994)
- ML20214K997 + (ML20214K997)
- IR 05000302/1986034 + (ML20214K999)
- ML20214L001 + (ML20214L001)
- ML20214L005 + (ML20214L005)
- ML20214L010 + (ML20214L010)
- 05000458/LER-1986-060, Forwards Info Re Items Identified Subsequent to 861110 Conference Re Insp Rept 50-458/86-36.Addl Info Available in LER 86-60,submitted on 861113 + (ML20214L013)
- ML20214L014 + (ML20214L014)
- ML20214L016 + (ML20214L016)
- ML20214L017 + (ML20214L017)
- ML20214L019 + (ML20214L019)
- ML20214L021 + (ML20214L021)
- NRC-87-0053, Confirms Util Agreement Made at 870429 Meeting W/Nrc to Tighten Pipe Clamp Bolts for Clamps on Main Steam & Bypass Piping.Activity Completed on 870515.Nut & Bolt Torque Verified + (ML20214L023)
- ML20214L024 + (ML20214L024)
- ML20214L028 + (ML20214L028)