ML20214L028
| ML20214L028 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/04/1987 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Cheng C, Marsh L, Shao L Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8705290156 | |
| Download: ML20214L028 (2) | |
Text
.
May 4,1987
,_ DISTRIBUTION.w/o enclosure
'dDocket File =, a NRC PDR Dockets Nos. 50-456/457 Local PDR JStevens MEMORANDUM FOR:
L. Shao, Director CVogan Division of Engineering and Systems Technology C. Cheng, Chief Materials Engineering Branch, DEST L. Marsh, Chief Mechanical Engineering Branch, DEST G. Bagchi, Chief Structural and Geosciences Branch, DEST C. McCracken, Chief Chemical Engineering Branch, DEST J. Joyce, Chief Instrumentation and Control Systems Branch, DEST J. Craig, Chief Plant Systems Branch, DEST M. Hodges, Chief Reactor Systems Branch, DEST E. Reis, Deputy Assistant General Counsel Reactor Licensing Branch, 0GC FROM:
Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V, and Special Projects
SUBJECT:
REVIEW 0F FINAL DRAFT OF BRAIDWOOD SSER 3 Enclosed is the final draf t of Supplemental Safety Evaluatior, Report No. 3 for Braidwood Station, Units 1 and 2 which is being transmitted for your review, comment, and approval.
8705290156 870504 PDR ADOCK 05000456 P
v s
2' i
~
Since'the low power license 'is scheduled to be issued by May 8,1987, an
. expedited review by-COB Tuesday, May 5,-1987, is requested.. Please provide comments to the Braidwood Project Manager, Janice' A.. Stevens, X24993.
Original signed by/.
4-l Daniel R. Muller, Director Project Directorate III-2
' Division of Reactor Projects - III, IV, j
V, and Special Projects j
Enclosure:
j As stated i
cc w/o enclosure:
D. Crutchfield s
i i
i i
1 4
1 t
l
- 3..
-1 i
0FFICIAL. RECORD COPY' I
JStevens41'V.PD,U "ga:
PDIII-2:PM D
J
/
DM er 5// /87 ()
5/c/ /87 i
.