Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J499 + (ML20214J499)
- ML20214J500 + (ML20214J500)
- IR 05000309/1987003 + (ML20214J501)
- ML20214J503 + (ML20214J503)
- ML20214J504 + (ML20214J504)
- IR 05000412/1986020 + (ML20214J505)
- ML20214J506 + (ML20214J506)
- ML20214J508 + (ML20214J508)
- ML20214J509 + (ML20214J509)
- ML20214J510 + (ML20214J510)
- ML20214J514 + (ML20214J514)
- W3P87-1329, Remits Insp Fee for 860622-860927 + (ML20214J515)
- ML20214J516 + (ML20214J516)
- ML20214J517 + (ML20214J517)
- 05000458/LER-1986-044, :on 860807,reactor Trip Occurred as Result of Turbine Bldg High Temp Isolation Trip Signal.Caused by Failure of Main Steam Moisture Separator Reheater Drain Tank Gasket.Gasket Replaced + (ML20214J518)
- GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant + (ML20214J520)
- ML20214J522 + (ML20214J522)
- ML20214J524 + (ML20214J524)
- 0CAN078613, Forwards Revised Justifications for Continued Operation Re Limitorque Operator Concerns Expressed by NRC During 860714- 18 Audit/Insp of Environ Qualification Program,Per 860722 Telcon.Clarification of Specific Issues Provided + (ML20214J525)
- ML20214J526 + (ML20214J526)
- ML20214J528 + (ML20214J528)
- ML20214J529 + (ML20214J529)
- ML20214J530 + (ML20214J530)
- ML20214J531 + (ML20214J531)
- ML20214J532 + (ML20214J532)
- ML20214J534 + (ML20214J534)
- ML20214J535 + (ML20214J535)
- ML20214J536 + (ML20214J536)
- ML20214J537 + (ML20214J537)
- ML20214J538 + (ML20214J538)
- ML20214J539 + (ML20214J539)
- ML20214J542 + (ML20214J542)
- PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup + (ML20214J543)
- ML20214J545 + (ML20214J545)
- ML20214J548 + (ML20214J548)
- ML20214J549 + (ML20214J549)
- ML20214J551 + (ML20214J551)
- ML20214J552 + (ML20214J552)
- ML20214J553 + (ML20214J553)
- ML20214J556 + (ML20214J556)
- ML20214J557 + (ML20214J557)
- ML20214J558 + (ML20214J558)
- ST-HL-AE-1817, Forwards marked-up FSAR Pages 3.10N-7 Through 3.10N-9 & Question/Response 032.5 Re Equipment Qualification.Revs Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (ML20214J559)
- TXX-4826, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions:Design Change Authorization 13,349 Rereviewed & Results Documented in Calculations SRB-128C,Set 2,Rev 10 + (ML20214J560)
- ML20214J561 + (ML20214J561)
- ML20214J562 + (ML20214J562)
- ML20214J564 + (ML20214J564)
- ML20214J565 + (ML20214J565)
- RBG-25974, Special Rept Re Measured Settlement Value Outside Tech Spec 3.7.10-1 Limits.Probably Caused by Effects of Const Schedule on Structural Settlement.Calculation Revised to Account for Differences in Const Schedule + (ML20214J566)
- 05000528/LER-1986-047, :on 860712,reactor Tripped at 100% Power on Low Reactor Coolant Flow Signal in Steam Generator 2.Caused by 860522 Reduction in Trip Setpoints for Low Reactor Flow. New Trip Setpoints Being Evaluated + (ML20214J567)
- ML20214J568 + (ML20214J568)