Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212J867 + (ML20212J867)
- ML20212J876 + (ML20212J876)
- IR 05000315/1986042 + (ML20212J877)
- ML20212J878 + (ML20212J878)
- ML20212J880 + (ML20212J880)
- ML20212J881 + (ML20212J881)
- ML20212J883 + (ML20212J883)
- ML20212J887 + (ML20212J887)
- ML20212J891 + (ML20212J891)
- ML20212J893 + (ML20212J893)
- ML20212J894 + (ML20212J894)
- ML20212J895 + (ML20212J895)
- ML20212J896 + (ML20212J896)
- ML20212J897 + (ML20212J897)
- PY-CEI-NRR-0592, Application to Amend License NPF-58,revising Tech Spec Table 3.6.4-1 to Change Max Isolation Time of RCIC Sys Inboard Containment Isolation Valve 1E51-F063 to 20 S.Fee Paid + (ML20212J898)
- ML20212J901 + (ML20212J901)
- ML20212J903 + (ML20212J903)
- ML20212J905 + (ML20212J905)
- ML20212J906 + (ML20212J906)
- ML20212J907 + (ML20212J907)
- ML20212J910 + (ML20212J910)
- ML20212J911 + (ML20212J911)
- 05000327/LER-1986-059, :on 861231,eight Fire Dampers in Diesel Generator Bldg Identified as Not Being Verified Functional by Visual Insp Every 18 Months.Caused by Personnel Error. Surveillance Instruction SI-233.3 Changed + (ML20212J912)
- ML20212J914 + (ML20212J914)
- ML20212J915 + (ML20212J915)
- ML20212J916 + (ML20212J916)
- ML20212J917 + (ML20212J917)
- ML20212J919 + (ML20212J919)
- ML20212J920 + (ML20212J920)
- ML20212J921 + (ML20212J921)
- ML20212J923 + (ML20212J923)
- ML20212J924 + (ML20212J924)
- ML20212J925 + (ML20212J925)
- ML20212J926 + (ML20212J926)
- 05000400/LER-1986-009, :on 861211,while Performing Surveillance Test Procedure,Unanticipated Train B Safety Injection Signal Actuated & Second Actuation Occurred.Caused by Procedural Inadequacy & Personnel Error.Procedure Revised + (ML20212J927)
- ML20212J928 + (ML20212J928)
- ML20212J929 + (ML20212J929)
- ML20212J934 + (ML20212J934)
- ML20212J938 + (ML20212J938)
- ML20212J939 + (ML20212J939)
- ML20212J943 + (ML20212J943)
- U-600783, Requests Extension of 30-day Due Date for Response to Violations Noted in Insp Rept 50-461/86-60 Re post-maint Testing Evaluations of Maint Work Requests.Response Will Be Provided by 861219 + (ML20212J947)
- ML20212J948 + (ML20212J948)
- ML20212J949 + (ML20212J949)
- ML20212J953 + (ML20212J953)
- ML20212J954 + (ML20212J954)
- ML20212J955 + (ML20212J955)
- ML20212J957 + (ML20212J957)
- ML20212J960 + (ML20212J960)
- ML20212J961 + (ML20212J961)
- NUREG-0827, Safety Evaluation Supporting Proposed Installation of remotely-operated Solenoid in Pipe Tunnel Outside Containment for Offgas Vent Line + (ML20212J964)