MONTHYEARML20211P2871999-09-0909 September 1999 Proposed Tech Specs Pages,Increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal ML20216E4631999-09-0909 September 1999 Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented ML20216E4791999-09-0909 September 1999 Proposed Tech Specs Revising Allowable Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons ML20210M7851999-08-0404 August 1999 Proposed Tech Specs 3.9.1,incorporating Addl Option Into Required Actions When Refueling Interlocks Are Inoperable ML20196A2021999-06-17017 June 1999 Proposed Tech Specs SRs Implementing 24-month Operating Cycle at Pnpp ML20204E4971999-03-15015 March 1999 Proposed Tech Specs,Correcting Typos Found in Table 3.3.6.1-1 ML20207K1041999-03-0404 March 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of FW Penetrations ML20206Q3571999-01-0606 January 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of Feedwater Penetrations ML20155D9431998-10-27027 October 1998 Proposed Tech Specs 2.1.1.2,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by GE ML20155D8241998-10-27027 October 1998 Proposed Tech Specs Adding Two Paragraphs to TS 5.2.2.e, Organization - Unit Staff ML20151V4831998-09-0909 September 1998 Proposed Tech Specs Stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Check Valves Do Not Need to Be Included in Hydrostatic Program ML20151V1111998-09-0303 September 1998 Proposed Tech Specs Permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allowing Performance of EDG 24-hour TS SR Test in Modes 1 & 2 ML20151V6861998-09-0303 September 1998 Proposed Tech Specs Increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Volume Due to Vortex Formation at Eductor Nozzles Located in Fuel Oil Storage Tank ML20151S9561998-08-31031 August 1998 Proposed Tech Specs,Allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable ML20236T7911998-07-22022 July 1998 Proposed Tech Specs Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys ML20151P1921998-07-13013 July 1998 Proposed Tech Specs,Increasing Present +/- 1% Tolerance on Safety Mode Lift Setpoint for SRVs to +/- 3% ML20236H8411998-06-30030 June 1998 Proposed Tech Specs,Increasing Boron Concentration in Standby Liquid Control Sys for Pnpp Cycle 8 Fuel Design & Providing Margin for Future Cycles as Required ML20216H9361998-04-14014 April 1998 Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 ML20197F7871997-12-23023 December 1997 Proposed Tech Specs,Revising 3.8.1 Re AC Sources to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs ML20217K6501997-10-22022 October 1997 Proposed Tech Specs Incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchanger ML20217F5911997-10-0202 October 1997 Proposed Tech Specs,Adding Note to TS 2.1.1.2 Re MCPR SL Values & Adding Footnote to TS 5.6.5.b to Reference NRC SER That Approved MCPR SL Values for Cycle 7 ML20210T9631997-09-0808 September 1997 Proposed Tech Specs 5.2.2.e,removing Reference to NRC Policy Statement on Working Hours.Rev Allows Changes to Specific Overtime Limits & Working Hours to Be Evaluated IAW 10CFR50.59, Changes,Tests & Experiments ML20217Q4591997-08-28028 August 1997 Proposed Tech Specs 3.4.11,revising Pressure-Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20148A6591997-05-0202 May 1997 Proposed Tech Specs,Revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys ML20148A6871997-05-0202 May 1997 Proposed Tech Specs Re Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria ML20137S7761997-04-0909 April 1997 Proposed TS Requirements 3.9.1.1 & 3.9.2.2 Re Frequency on Refueling Equipment & one-rod-out Interlocks ML20134D8251997-01-31031 January 1997 Proposed Tech Specs 1.1 Re definitions,3.6.1.1 Re Primary Containment - operating,3.6.1.2 Re Primary Containment Air locks,3.6.1.3 Re PCIVs,3.6.5.1 Re Drywell & 5.5 Re Programs & Manuals ML20134D8751996-10-24024 October 1996 Proposed Tech Specs 2.1.1.2,safety Limits Applying Conservatism by Increasing MCPR Safety Limit Values ML20117E7891996-08-27027 August 1996 Proposed Tech Specs,Revising Mls Leakage Requirements & Eliminating MSIV Control Sys ML20108A2581996-04-26026 April 1996 Proposed Improved Tech Specs ML20100N9501996-03-0101 March 1996 Proposed TS Pages Re Drywell Leak Rate Testing Requirements ML20100L3331996-02-27027 February 1996 Proposed Tech Specs Re Drywell Personnel Air Lock Shield Door Analyses ML20100J5971996-02-24024 February 1996 Proposed Tech Specs,Revising Definition of Core Alteration ML20149K2221996-02-17017 February 1996 Proposed Tech Specs,Reflecting Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 ML20096D4651996-01-16016 January 1996 Proposed TS Requirements for Drywell Leak Rate Testing ML20096C0591996-01-10010 January 1996 Proposed Tech Specs,Requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095H4721995-12-20020 December 1995 Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor ML20094E6751995-11-0202 November 1995 Proposed Tech Spec,Requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operation ML20094F2051995-11-0202 November 1995 Proposed Tech Specs for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Performing Core Alterations ML20091R1911995-08-29029 August 1995 Proposed Tech Specs,Incorporating New Instrumentation Trip Setpoints & Allowable Values ML20086C7281995-06-30030 June 1995 Proposed Tech Specs Re Surveillance Test Interval Extension Request ML20084U0781995-06-0909 June 1995 Proposed Tech Specs Reflecting one-time Extension of Performance Intervals of Certain SRs ML20084Q5351995-06-0101 June 1995 Proposed Tech Specs for Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnnp Improved TS LAR ML20083Q1991995-05-18018 May 1995 Proposed Tech Specs for Conversion to TS Based on NUREG-1434, Improved BWR6 Ts ML20083A6841995-05-0505 May 1995 Proposed Tech Specs Re Changes to App a TSs ML20087H8911995-05-0101 May 1995 Proposed Tech Specs Re Incorporation of Results of Work Performed by BWROG ML20087H9311995-04-28028 April 1995 Proposed Tech Specs,Proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS ML20087H9411995-04-28028 April 1995 Proposed Tech Specs Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & in Attachment 2 to Operating License ML20082C2681995-04-0303 April 1995 Proposed Tech Specs,Adding New Programmatic Requirements Governing Radiological Effluents & Relocating Procedural Details of RETS to ODCM or PCP ML20081K3191995-03-24024 March 1995 Proposed Tech Specs Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements 1999-09-09
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E4791999-09-0909 September 1999 Proposed Tech Specs Revising Allowable Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons ML20216E4631999-09-0909 September 1999 Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented ML20211P2871999-09-0909 September 1999 Proposed Tech Specs Pages,Increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal ML20210M7851999-08-0404 August 1999 Proposed Tech Specs 3.9.1,incorporating Addl Option Into Required Actions When Refueling Interlocks Are Inoperable ML20209B3391999-06-28028 June 1999 Simulator Four Yr Test Rept ML20196A2021999-06-17017 June 1999 Proposed Tech Specs SRs Implementing 24-month Operating Cycle at Pnpp ML20205C6351999-03-16016 March 1999 Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair ML20204E4971999-03-15015 March 1999 Proposed Tech Specs,Correcting Typos Found in Table 3.3.6.1-1 ML20207K1041999-03-0404 March 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of FW Penetrations ML20206Q3571999-01-0606 January 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of Feedwater Penetrations ML20195H5381998-11-18018 November 1998 Rev 4 to Pump & Valve Inservice Testing Program Plan ML20155D9431998-10-27027 October 1998 Proposed Tech Specs 2.1.1.2,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by GE ML20155D8241998-10-27027 October 1998 Proposed Tech Specs Adding Two Paragraphs to TS 5.2.2.e, Organization - Unit Staff ML20196H5131998-10-0808 October 1998 Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant ML20151V4831998-09-0909 September 1998 Proposed Tech Specs Stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Check Valves Do Not Need to Be Included in Hydrostatic Program ML20151V6861998-09-0303 September 1998 Proposed Tech Specs Increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Volume Due to Vortex Formation at Eductor Nozzles Located in Fuel Oil Storage Tank ML20151V1111998-09-0303 September 1998 Proposed Tech Specs Permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allowing Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with1998-09-0202 September 1998 Rev 5 to Perry NPP Odcm. with ML20151S9561998-08-31031 August 1998 Proposed Tech Specs,Allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable ML20236T7911998-07-22022 July 1998 Proposed Tech Specs Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys ML20151P1921998-07-13013 July 1998 Proposed Tech Specs,Increasing Present +/- 1% Tolerance on Safety Mode Lift Setpoint for SRVs to +/- 3% ML20236H8411998-06-30030 June 1998 Proposed Tech Specs,Increasing Boron Concentration in Standby Liquid Control Sys for Pnpp Cycle 8 Fuel Design & Providing Margin for Future Cycles as Required ML20236T8451998-06-24024 June 1998 Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp ML20216H9361998-04-14014 April 1998 Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 ML20203G4781998-02-23023 February 1998 Maint Progress Review for Perry Nuclear Power Plant ML20197F7871997-12-23023 December 1997 Proposed Tech Specs,Revising 3.8.1 Re AC Sources to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs ML20217K6501997-10-22022 October 1997 Proposed Tech Specs Incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchanger ML20217F5911997-10-0202 October 1997 Proposed Tech Specs,Adding Note to TS 2.1.1.2 Re MCPR SL Values & Adding Footnote to TS 5.6.5.b to Reference NRC SER That Approved MCPR SL Values for Cycle 7 ML20210U8701997-09-0808 September 1997 Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp ML20210T9631997-09-0808 September 1997 Proposed Tech Specs 5.2.2.e,removing Reference to NRC Policy Statement on Working Hours.Rev Allows Changes to Specific Overtime Limits & Working Hours to Be Evaluated IAW 10CFR50.59, Changes,Tests & Experiments ML20217Q4591997-08-28028 August 1997 Proposed Tech Specs 3.4.11,revising Pressure-Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20148A6871997-05-0202 May 1997 Proposed Tech Specs Re Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria ML20148A6591997-05-0202 May 1997 Proposed Tech Specs,Revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys ML20137S7761997-04-0909 April 1997 Proposed TS Requirements 3.9.1.1 & 3.9.2.2 Re Frequency on Refueling Equipment & one-rod-out Interlocks ML20134D8251997-01-31031 January 1997 Proposed Tech Specs 1.1 Re definitions,3.6.1.1 Re Primary Containment - operating,3.6.1.2 Re Primary Containment Air locks,3.6.1.3 Re PCIVs,3.6.5.1 Re Drywell & 5.5 Re Programs & Manuals ML20147B8271997-01-24024 January 1997 Rev 3 to Vol 1 of Inservice Exam Program ML20134D8751996-10-24024 October 1996 Proposed Tech Specs 2.1.1.2,safety Limits Applying Conservatism by Increasing MCPR Safety Limit Values ML20117E7891996-08-27027 August 1996 Proposed Tech Specs,Revising Mls Leakage Requirements & Eliminating MSIV Control Sys ML20108A2581996-04-26026 April 1996 Proposed Improved Tech Specs ML20100N9501996-03-0101 March 1996 Proposed TS Pages Re Drywell Leak Rate Testing Requirements ML20100L3331996-02-27027 February 1996 Proposed Tech Specs Re Drywell Personnel Air Lock Shield Door Analyses ML20100J5971996-02-24024 February 1996 Proposed Tech Specs,Revising Definition of Core Alteration ML20149K2221996-02-17017 February 1996 Proposed Tech Specs,Reflecting Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 ML20100G0161996-02-0101 February 1996 Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines ML20096D4651996-01-16016 January 1996 Proposed TS Requirements for Drywell Leak Rate Testing ML20096C0591996-01-10010 January 1996 Proposed Tech Specs,Requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095H4721995-12-20020 December 1995 Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor ML20108B2851995-11-22022 November 1995 Rev 5 to Offsite Dose Calculation Manual ML20094F2051995-11-0202 November 1995 Proposed Tech Specs for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Performing Core Alterations ML20094E6751995-11-0202 November 1995 Proposed Tech Spec,Requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operation 1999-09-09
[Table view] |
Text
-_
..e
. 1, , .
m R
, f a.
. r- m . CONTADMENT AUTOMATIC ISOLATION VALVES (Continued)
- E $ Valve Penetration Valve ge) t Maximum Secondary Test 3 -< Number _ Number Group Isolation Time
, 7 l 1. e containment Pressure (Seconds) Bypass Path (Psig)
$.;.;.5'g .
(Yes/No)
!;?'. N .-*#
^
1E21-F011 P105' 17 20*
1E21-F012 P105 2 No (b) r,y.!.; 180* No (b)
} U^#y IE22-F004 -
P410 16 27 1 }'i- 1E22-F012 No(h) yy,33 h)
P409 16 5 11.31
) :f.g.
4 IE22-F023 P409 1 180* No((h)
No yy,33 g" .
1
'". 1E32-F001A P124 10 20 1E32-F001E P416 N6 11.31 10 20 1E32-F001J P122 No 11.31 1 .
10- 20 IE32-F001N No 11.31
- p.f'<j
- P415 10 20 No 11.31 b*' " 1E51-F031(I)'
I P101 9 30
No (b)
J. #. T- IE51-F063(I) 1E51-F064 I} . '
P422 9 JW 2# No 11.31 l P422 9 l #hi'. ~ U1E51-F076l}
~
I P422 9 10 No(h) 11.31 15* No 11.31 IE51-F077I} P106, P107
- h'.-Y ' a ~ .,
P115 P429 9 22.5* No 11.31
- .. 1G33-F001 i !!.p4l.- 1G33-F004 P131 P131 7
7 15 15 Yes 11.31
- Yes 11.31 P424 7 15 Yes 11.31
, d IG33-F034 P424 7 15
) (,,d: * *1G33-F039 P132 7 Yelh) 1.31 15 No 11.31 j b i "; 1G33-F040 P132 7 15 1G33-F053
. No 11.31 P419 7 15 l Yes 11.31 ll I'.! } 1G33-F054 P419 7 15 Yes 11.31
- hp i '
I B703090176 870304 0
,j,- PDR ADOCK 050 g P ~
j }h'; .
1 2
- hp.
- c
' V,4 . .
.,_ ELECTRICAL POWER SYSTEMS
[?Sf:
. f N2" SURVEILLANCE REQUIREMENTS (Continued) e
,. a) Division 1 1 604 amps for the first 60 seconds 1 127 amps for.the next 9 minutes
> 380 amps for the next 1 minute j[ 127 amps for the next 108 minutes 1 326 amps for the last 60 seconds b) Division 2 39fi l
1469- amps for the first 60 seconds I
' > 119 amps for the next 9 minutes j[ 372 amps for the next 1 minute 1 119 amps for the next 108 minutes 1316 amps for the last 60 seconds c) Division 3 1 95 amps for the first 60 seconds 1 16 amps for the last 119 minutes
- e. At least once per 60 months, during shutdown, by verifying that the
( battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. At this once per 60 month interval, this performance discharge test may be performed in lieu of the battery service test.
- f. At least once per 18 months, during shutdown, performance discharge tests of battery capacity shall be given to any battery that shows signs of degradation or has reached 85% of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
e PERRY - UNIT 1 3/4 8-14 v
m . - . . , . . _ . - - - _ _ _ . . _
ELECTRICAL POWER SYSTEMS
$e1
LIMITING CONDITION FOR OPERATION (Continued)
, 2. Division 2, consisting of 125 volt D.C. distribution panels ED-1-B-06 and ED-1-B-08, N nyivp9A l
. 3. Division 3, consisting of 125 volt D.C. distribution panel 1R42-S037.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION:
- a. For A.C. pcwsr distribution:
- 1. With either Division 1 or Division 2 of the above required A.C.
distribution system _not energized, re-energize the division within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 2. With Civision 3 of the above required A.C. distribution system not ent . gized, declare the HPCS system inoperable and take the ACTION required by Specification 3.5.1.
l
,( b. For D.C. power distribution:
- 1. With either Division 1 or Division 2 of the above required D.C.
distribution system not energized, re-energize the division within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next
! 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 2. With Division 3 of the above required D.C. distribution system not energized, declare the HPCS system inoperable and take the ACTION required by Specification 3.5.1.
SURVEILLANCE REQUIREMENTS 4.8.3.1 Each of the above required power distribution system divisions shall be determined energized at least once per 7 days by verifying voltage and correct breaker alignment on the busses /MCCs/ panels.
l b .
PERRY - UNIT 1 3/4 8-18 -
se e
.p
[ .
ELECTRICAL POWER SYSTEMS
- k. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, the following power distribution system divisions shall
,; be energized:
- a. For A.C. power distribution, Division 1 or Division 2, and when s the HPCS system is required to be OPERAB'E, Division 3, with:
- 1. Division 1 consisting of:
a) 4160 volt A.C. bus EH11.
b) 480 volt A.C. busses EF-1-A and EF-1-B.
c) 480 volt A.C. MCCs EF-1-A-07, EF-1-A-08, EF-1-A-09, EF-1-A-12, EF-1-B-07, EF-1-B-08, EF-1-B-09, and
.' EF-1-B-10/EF-1-0-10.*
t' d) 120 volt A.C. distribution panels EB-1-Al and EK-1-Al in 480 volt MCCs EF-1-B-07 and EF-1-A-07.
. e) 120 volt A.C. bus EV-1-A energized from inverter 1R14-5012 connected to D.C. bus ED-1-A-06, or energized from A.C. bus EF-1-B-07.
- 2. Division 2 consisting of:
a) 4160 volt A.C. bus EH12.
\ 480 volt A.C. busses EF-1-C and EF-1-D.
b) c) 480 volt A.C. MCCs EF-1-C-07, EF-1-C-08, EF-1-C-09, EF-1-C-12, EF-1-D-07, EF-1-0-08, and EF-1-D-09.
d) 120 volt A.C. distribution panels EB-1-B1 and EK-1-B1 in
. 480 volt MCCs EF-1-0-07 and EF-1-C-07.
e) 120 volt A.C. bus EV-1-B energized from inverter 1R14-S013 connected to D.C. bus ED-1-B-08 or energized from A.C.
bus EF-1-0-09.
- 3. Division 3 consisting of:
a) 4160 volt A.C. bus EH13.
b) 480 volt A.C. MCCs EF-1-E-1 and EF-1-E-2.
i c) 120 volt A.C. distribution panel EK-1-C1 in 480 volt MCC .
EF-1-E-1.
- b. For D.C. power distribution, Division 1 or Division 2, and when the HPCS system is required to be OPERABLE, Division 3, with:
- 1. Division 1 consisting of 125 volt D.C. distribution panels l, ED-1-A-06 and MCC ED-1-A-09.
- 2. Division 2 consisting of 125 ol ..C J istribution panels ED-1-B-06 and ED-1-B-08 -)/p .
( $480 volt MCC EF-1-B-10/EF-1-0-10 is normally energized from Division 1.
Division 2 provides an alternate power source.
,, PERRY - UNIT 1 3/4 8-19 em