Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000324/1986025 + (ML20212B473)
- ML20212B476 + (ML20212B476)
- ML20212B477 + (ML20212B477)
- ML20212B478 + (ML20212B478)
- ML20212B479 + (ML20212B479)
- ML20212B483 + (ML20212B483)
- ST-HL-AE-1863, Forwards South Texas Project Unit 1 Environ Qualification of Safety-Related Electrical Equipment, Providing Addl Program Description.Encl Should Be Used W/Fsar & Ref Submittal to Understand Complete Plant Program & Commitment + (ML20212B484)
- ML20212B485 + (ML20212B485)
- ML20212B487 + (ML20212B487)
- ML20212B488 + (ML20212B488)
- ML20212B492 + (ML20212B492)
- IR 05000443/1986039 + (ML20212B493)
- RC-97-0216, Forwards Revised Epips,Including Rev 1 to EPP-052, Emergency Info Plan & Rev 5,change B to EPP-104, Verification of Communications Operability. Rev 5,change B to EPP-104 Corrects Error in Rev 5,change a to EPP-104 + (ML20212B495)
- ML20212B497 + (ML20212B497)
- ML20212B502 + (ML20212B502)
- ML20212B503 + (ML20212B503)
- ML20212B505 + (ML20212B505)
- ML20212B506 + (ML20212B506)
- ML20212B512 + (ML20212B512)
- SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With + (ML20212B515)
- ML20212B517 + (ML20212B517)
- ML20212B518 + (ML20212B518)
- U-600663, Confirms That GE Qualification Rept on Hydraulic Control Units Purchased & Incorporated Into Equipment Qualification Rept,Per SER Outstanding Issue 7ii.Hydraulic Control Unit Bolts Tightened Following Earthquake + (ML20212B520)
- ML20212B523 + (ML20212B523)
- ML20212B525 + (ML20212B525)
- ML20212B527 + (ML20212B527)
- PNO-III-86-074, on 860731,licensee Authorized to Resume Operation Up to 5% Power.Further NRC Authorization Required for Higher Power Levels.Startup Will Begin on 860801 + (ML20212B528)
- IA-99-322, Forwards Shell of Crr Based Upon Recently Completed Final Completion Review Rept for Remedial Action at Shiprock U Mill Tailings Site,Shiprock,Nm & Summary of This Standardized Format + (ML20212B529)
- ML20212B529 + (ML20212B529)
- ML20212B530 + (ML20212B530)
- ML20212B531 + (ML20212B531)
- IR 05000456/1986057 + (ML20212B532)
- ML20212B533 + (ML20212B533)
- ML20212B535 + (ML20212B535)
- ML20212B536 + (ML20212B536)
- BSEP-97-0453, Withdraws 970723 Relief Request Re through-wall Leak on Svc Water Sys Nuclear Header.Repair of Line 2-SW-103-30-157 Has Been Completed by Performing Weld Repair of Flawed Area + (ML20212B537)
- B12097, Submits Addl Info on Isap Topic 1.11, Post-Accident Hydrogen Monitor, Per .Hydrogen/Oxygen Monitor & Info on Applicability of Rev 4 to BWR Owners Group Emergency Procedure Guidelines Discussed + (ML20212B538)
- ML20212B541 + (ML20212B541)
- IR 05000373/1997015 + (ML20212B542)
- B12176, Forwards Change 1 to Rev 1 to Physical Security Plan.Change Withheld (Ref 10CFR73.21(b) & 2.790(a)) + (ML20212B543)
- ML20212B544 + (ML20212B544)
- ML20212B546 + (ML20212B546)
- ML20212B547 + (ML20212B547)
- ML20212B550 + (ML20212B550)
- ML20212B551 + (ML20212B551)
- ML20212B552 + (ML20212B552)
- ML20212B553 + (ML20212B553)
- ML20212B554 + (ML20212B554)
- ML20212B555 + (ML20212B555)
- HL-5497, Informs of Results of GE Analysis & Believes That Practice Concerning Anticipation of Emergency Depressurization on Loss of high-pressure Makeup Sys to RPV Is Appropriate & Will Continue Strategy + (ML20212B556)
- ML20212B557 + (ML20212B557)